Laserfiche WebLink
w .o' <br /> STATE OFCAUFORNIAa <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION -FORM B <br /> COMPLETE A SEPARATE FORM FOR H TANK SYSTEM. <br /> MARK ONLY ❑ I NEW PERMIT 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION a T P NTLY OSED <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ a AMENDED PERMIT Q 8 TEMPORARY TANK CLOSURE ❑ e T E,10V <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: r <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNERS TANK 1.D.t B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MCIDAYNEAR) 0. TANK CAPACITY IN GALLONS: <br /> II.TANK CeNTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL Q d OIL 8. C. to FIEGUI UNLEADED J DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY FRODUOT t0 PREMIJM UNLEADED a GASAHOL T METHANOL <br /> ❑ ❑ 95 UNKNOWN 2 WASTE le MOGRADE UNLEADED 5 JETFUEL 8 M85 <br /> 3 CHEMICAL PRODUCT ❑ ❑ <br /> 9H OTHER(DESCRBE IN REMO.BELOW) <br /> D. IF(A1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED 2 LEADED C.A.S.Y. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ a SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ I BME STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS O d STEEL CLAD W/FIBERGLASS REINFORCED PuSTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYWNYL CHLORIDE ❑ T ALUMINUM ❑ 8 100% METHANOL COMPATIBLE WIFRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ I RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 6 PHENOLIC LINING <br /> LINING OR ❑ S Guns UMMS ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR I POLYETHYLENE WRAP 2 COATING <br /> CORROSION ❑O 3 Wim- WRAP ❑ a FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODICPROTECOO ❑ 91 NONE a 95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL.et1:. SPILL CONTAINMEM INSTALLED(YEAR) OVERFILL PREVENTION EOULPMENT INSTALLEp(YEAR) <br /> DROP TUBE YES_ NO_ STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> FSYSTEMTYPE A U I SUCTION A U 2 PRESSURE A U 3 GRAVITY A U A FLEXIBLE PIPING A U 99 OTHER <br /> N A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U B9 OTHER <br /> A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U a FIBERGLASS PIPE <br /> A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 6 100% METHANOL COMPATISLEWIFRP <br /> - A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> 0. LEAK DETECTION ❑t 'Ea'u°T'u ANB LFAIc ❑2 uE I%;Hma5 ❑3 aKlaAlas NRnrm1.L ❑a as-moNc O 5 > Rnv Q yy oTNeq <br /> [EtEtTOR 1EST61O <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHELK ❑ 2 RECONCILIATIONUAL O� ❑ J VADOZE MONITORING ❑ a GAUGINGAUTOMATIC TANK ❑ 5 MONITORING TER ❑ 6 TANNUAL <br /> ESTTNGTANK <br /> ❑ 7 MpNITII'ORONUGS INTER57TT1AL ❑ 8 51R ❑ 9 TANK WEEKLY <br /> NGAL❑ 10 MONTHLY TANK Q 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION(P£RMaN£NT CLOSURE N.PLAM <br /> STING <br /> 1.ESTIMATED DATE LAST USED(MOIDAWYR) I 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY.AND 7.0 THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNERS NAME <br /> (PRIRm A9 HATURE) DATE <br /> LOCAL AGENCY USE ONLY THE STATE L).NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW , ! —2 <br /> C�TOUNTY X JURISDICTION a FACILITY a TANK A / <br /> STATE <br /> 04 <br /> STATE / I z O Z O v <br /> PERMIT NUMBER PERMIT APPROVED SYMATE J PERMIT EXPIRATION DATE <br /> I a � <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPUCATID" FORM A.UNLESS A CURRENT FORMA HAS BEEN FILED. FORM C....ST BE COMPLETED FOR INSTALLATIONS.ITS <br /> FISHOULD BE ACCOMPANIED BY A PLOT PI" -HIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE I"— LUNO STORAGE TANK flEGUUTKINS <br /> FORM B (III - _� T �� FOIIID1asm <br />