My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
INSTALL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 10:54:08 AM
Creation date
11/5/2018 12:27:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1989
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUCKLEY COVE\4950\PR0231028\INSTALLATION 1989 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M o� ox 61 A 962p1 <br /> c <br /> c�t6$691 <br /> 2Qp�46 <br /> February 1 , 1989 <br /> Ms . Dianne Hinson <br /> San Joaquin Local Health District <br /> 1601 East Hazelton Avenue <br /> Stockton, CA 95201 <br /> Dear Ms . Hinson: <br /> I am formally requesting your agency' s authorization to install <br /> two new fuel tanks at the Stephens Anchorage property in Stock= <br /> ton per permit signed by K. Foley and dated November 29 , 1988 . <br /> The proposed tank installation is adjacent to the location of <br /> previously removed tanks which had some associated soil and <br /> groundwater contamination. We recognize the need to begin re- <br /> mediation of this problem and have notified Mr. Gordon Boggs of <br /> the Regional Water Board to this effect. Specifically we are <br /> prepared to proceed immediately with a site investigation follow- <br /> ing the guidelines of the Board. Within 30 days of completing <br /> this investigation we will file a remedial action plan which <br /> will address both soil and groundwater contamination at the site. <br /> Within 30 days of receiving authorization from the Board we will <br /> begin implementation of the plan. <br /> We recognize that the installation of the new tanks in no way <br /> alters our responsibility to remediate the soil and groundwater <br /> at the site. Further, we are aware that if clean-up cannot be <br /> aoromp1is4-)ed L.=ith -thee tanks its place that you could require th` <br /> removal of one or both tanks . <br /> We would appreciate your earliest possible consideration of this <br /> request so that we may resume business operations. If you re- <br /> quire additional information please contact me at your earliest <br /> convenience. <br /> Sincerely, <br /> Ste ens Marine, Inc. <br /> Richard Dunn <br /> President <br /> t <br /> cc: Gordon Boggs , CA RWQC Board <br /> Russell N. Juncal, WaterWork <br /> III,/rr Ali, Ikk � <br /> Yachts in the finest tradition since 1902 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.