My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
COMPLIANCE INFO 2002-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 9:24:49 AM
Creation date
11/5/2018 12:28:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2010
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUCKLEY COVE\4950\PR0231028\COMPLIANCE INFO 2002-2010.PDF
QuestysFileName
COMPLIANCE INFO 2002-2010
QuestysRecordDate
12/12/2017 4:53:20 PM
QuestysRecordID
3746268
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> 'fest Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure GaugeEquiprnent Resolution: 0-15 PSI <br /> Piping Run# 1 Piping Run #2 Piping Run # Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 20' 20' <br /> Product Stored: Premium Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 thin 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:30 9:40 <br /> Initial Reading(Rr): 5 PSI 5 PSI <br /> Test End Time: 10:00 10:10 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 30 min 30 min 30 rein 30 min <br /> Change in Reading(RF-R]): 0 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: x Pass ❑Fail x Pass ❑ Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.