Laserfiche WebLink
Site Address:'' k'_ �(� 4"N'"T>—I- (� r � of Testing/Servicing:L_/&/�L <br /> F. In-Tank Gauging f SXR Equipment: ❑ heck this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaLiging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of systern water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below, describe Irotrr and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Cpmplete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all chat apply) Simulated leak rate: 9-Yg.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* Far mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> Yes ❑ o* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> EJ N/A <br /> o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 7 Yes LI/f, <br /> In N/A or disconnected? <br /> ] Yes ❑ o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> Ej N/A malfunctions or fails a test? <br /> ] YesNo* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> / 0 N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> [. Comments: <br />