My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
COMPLIANCE INFO 2002-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 9:24:49 AM
Creation date
11/5/2018 12:28:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2010
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUCKLEY COVE\4950\PR0231028\COMPLIANCE INFO 2002-2010.PDF
QuestysFileName
COMPLIANCE INFO 2002-2010
QuestysRecordDate
12/12/2017 4:53:20 PM
QuestysRecordID
3746268
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO Nl_� <br /> 2 Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale snowing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> � 5 e, ' W s'4 u: 4 LAO jft <br /> t�y X <br /> 10 C' a F 6"1 c6Q•l"UAo A BC.ACk- tvC-_ -r © r <br /> L� <br /> Q t e u5ilfrnA) s Wi te- <br /> �,s�-c��, �s-�►w�1Z +.i.3- T�+�s l��+ate ���t,;r�.crc�3rt-ry'� 1'�'ttn1T�� <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> 1 G4-z P G <br /> u DIPS-�* 2►d 7C d <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.