Laserfiche WebLink
lolonitcri.ng System Certification <br /> Site Address: "W1 llmw <br /> Date of Testing/Servicing: <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> Gdc�< this box if no tank gauging or SIR equipment is installed. <br /> This section mast be completed if in-tank gauging egUipment is used to perform leak detection monitoring. <br /> Complete the following cheelclist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildtrp? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water leve! readings tested? <br /> ❑ Yes C] No* Were all probes reinstalled properly? <br /> Yes �] No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> '" In the Section H, beloFv, dCSCD'IbC IY(}FV and {VIICIt tllC5e DICfiCIeDrC1eS WCr'e UI'will tae CUI'D'CCtL'd. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes Ll No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> EJ N/A (Check all Haat apply) Simulated leak rate: F0"-g.p.h.; ❑ 0.1 g.p-ID ; ❑ 0.2 g.p.h. <br /> U-Yes ❑ No* Were all LLDs confinned operational and accurate within regulatory requirements? <br /> es ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the t <br /> N1A urbine automatically shut off if the LLD detects a leak? <br /> � <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> UN/A or disconnected? <br /> a Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> Cl`N/A malfunctions or fails a test? <br /> Yes Cl N.o* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑CN/A <br /> 3"Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> I. Comments: <br />