Laserfiche WebLink
SAN JOAQU COUNTY ENVIRONMENTAL HEALTH;)rFARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION ET 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mui <br /> PLAN TYPE ❑ MONITORING 1S IDENTICAL FOR ALL USTs AT THIS FACILITY. Ml0 <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> L FACILITY INFORMATION <br /> FACILITY 1D#(Agency Use Only) <br /> ` M103. <br /> FACILITY NAME <br /> FACILITY SITE ADDRESS L-115 <br /> JQ0 -j?)tAC_yI � � 11°4 CITY Dc ,�O� Mos <br /> I.I. 'EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be perforated in M06. <br /> accordance with the equipment manufacturers'instructions,or annually hichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICFD ANNUALLY ❑ 99.OTHER(Specify): MOT <br /> IIi. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location ofeach sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form-Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MMC) "I OR1NG IS PERFORMED USING THE FOLLOWING ME-rHOD(S):(Check all that apply) ,t ' <br /> I 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: &3-.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M11, <br /> PANEL MANUFACTURER: o p M12. MODEL#: )( 71aS Mil <br /> LEAK SENSOR MANUFACTURER: tz4]�►Ar.l M14. MODEL#(S): G-s" 3 M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MtT <br /> IN-TANK PROBE MANUFACTURER: M18. MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a,CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21 <br /> PROGRAMMEDTESTS: ❑ a.0.1 g.p.h, ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS Mei <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26 M27. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency epp.ww) <br /> ❑ 99.OTHER(Specify): M28 <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METiIOD(S)(Check all that apply) Nr'" <br /> 9'1.CONTINUOUS ELECTRONIC MONITORIN�G,/QF PIPING SUMP(S)!TRENCHES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: Lid g DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: 11,*4 A,..s Max. MODEL#: �C `1t✓S Mas. <br /> LEAK SENSOR MANUFACTURER: r t rt_ 11134 MODEL#(S): t--S-3 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a YES b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES 21b.NO M37. <br /> L`7 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 1 <br /> MLLDMANUFACTURER(s): dr-. 1`�er-t D M39 MODEL#(S): :5-rf r�1��.17 f SQA I M39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moa. MODEL#: M41 <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p,h. Mat <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M" <br /> 4.INTEGRITY TESTING �� <br /> TEST FREQUENCY: Lam'a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5,VISUAL MONITORING DONE: ❑ a,DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EAC-H TIME SYSTEM OPERATED** M47- <br /> *Requires agency approval -Allowed for monitoringof vuburied emergency generator fuel piping only per HSC§25281..5(b)(3) <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M48 <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />