Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES M NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the `Bite Health and Safety <br /> Plan" is available on the jobsite as required by Title B. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding. piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace OPW spill bucket Diesel <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> OPW 1C-2100C-DEUR - 5 nallnn fill mill containment CI base w/ Drain Valve <br /> OPW 61 SALP Fill Swivel Adaptor <br /> OPW 61 SOC-4011 Coaxial Overfill Prevention Valve <br /> 3 <br />