My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2013 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
BILLING 2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:14:11 PM
Creation date
11/5/2018 12:43:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2013 - 2017
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\244\PR0231137\BILLING 2013 - 2017.PDF
QuestysFileName
BILLING 2013 - 2017
QuestysRecordDate
10/25/2017 6:58:27 PM
QuestysRecordID
3150399
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 05 11 05: 24p p. 7 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN— PAGE 1 (one form per facil <br /> R01. <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> L. FACII,ITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 3. <br /> BUSINESS NAME(Samegl FACILITY NAMED <br /> / tin• BUSINESS SITE CITY Int. <br /> BUS ESS 511E ADDRESS S�r7Gsc- c o T <br /> IL SPILL CONTROL AND`CLEANUP METHODS <br /> This plan addresses umauthotized retries from UST systems and supplements the emergency response plans and procedtmes in Inc facdm y-3 Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-Off,etc.)and,if necessary.safely remove <br /> remaining hamr m material from the UST system <br /> • Any release to secondary containment will be pumped or otherwise removed within a time consistent local <br /> with the ability h the nus materials, <br /> containment system le <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used m contain and clean up manageable spills of hazardous materials. Absorbent material which hes become mo saturated to be <br /> m <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.1 l£mils that <br /> it is non-haarlous Used absorbent material,reusable or waste,will be stored in a properly labeled andsealed conta <br /> sealeiner. Waste material shad)be disposed of <br /> appropriately. <br /> Facility personnel will determine whether any water removed from secondary containment systems, m from clean-up activity,has been in contact with any <br /> • hazardous material. If the water is contarmnated,it will be managed as hazardous waste tmless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(ie.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,eta,will mi be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material m contact with secondary containment is not compatible with the material used for secondary CNItamment; <br /> 2. Secondary containment is prone to damage from any equiptrtent used to remove or clean up haatdous material collected in secondary,containment; <br /> 3. Hazardous material, otter than the pmducNwaste stored in the primary containment system, is placed inside secoudaty containment to treat or neutralize <br /> released producUwaste,and the added material or resulting material from such a combination is not compatible with secondary conmmmcm. <br /> M. SPILT. CONTROL AND.CLEAN-UP EQUIPMENT <br /> PERIODIC 6WPPI'ENANCE:SpiH control and clean-up equipment kept py on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipawat is inspected at least monthly,and after each use,supplies are replenished as needed. t)efemive equipment is repaired or replaced as necessary. <br /> E UIPMENT NOT PERMANENTLY ON-S HUT AVAILABLE FOR USE IF NEEDED: (Com tete onl ifa icable <br /> EQUIPMENT LOCATION AVAU-421LIFY <br /> R10. RIA es zw. <br /> err �h c rice r ✓t <br /> RIL R21. R31. <br /> R12 <br /> 21 R32. <br /> R13. R13. RJ3. <br /> Rt4. R24. PJa. <br /> R15. R 5 <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)TS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER TIflS RESPONSE PLAN: Rso <br /> NAME Rao. TITLE <br /> Su h -ir.d StnHh OuJ•ner <br /> R41. TITT.S R51. <br /> NAME Mcxr tr it W`nCr TS soy-, R5z <br /> Raz TITLE <br /> NAME <br /> R3. <br /> Rai. TITLE <br /> NAME <br /> V.. MONITORING INDICATORS <br /> ff MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: ¢� <br /> [3 L ADDITIONAL SYSTEMTESTIJG OR DATA COLLECTION [32. INSPECTION BY QUALIFIED PERSONS [33. RECALIBRATION OF EQIJIPtdINi <br /> ❑99. OTMR(SPae+tY): <br /> Rev.04/02/08 <br /> UN-02IR-V3 www.unidomorg <br />
The URL can be used to link to this page
Your browser does not support the video tag.