Laserfiche WebLink
6. EXCLUDED WORK ZONE <br /> The boundary of the site shall be an excluded work zone. Personnel <br /> not actively involved in site work activities (other than inspectors <br /> from concerned regulatory agencies) shall not be allowed within the <br /> excluded work zone. <br /> 7. HAZARD COMMUNICATION <br /> All personnel are to be familiar with this Site Work Health and <br /> Safety Plan. <br /> Field supervisor will telephone for emergency service and notify <br /> office when needed. <br /> 8 . ON-SITE WORK PLAN <br /> Removal of Flammable Vapors and Removal of Tanks <br /> Removal of flammable vapors and removal of tanks will be performed <br /> in accordance with the requirements of Local Regulatory Agencies. The <br /> following are general guide lines. <br /> A review of available codes, standards, and recommended procedures <br /> produces the following consensus: <br /> 1. All possible sources of ignition must be kept from impacting <br /> the tank or the area in which flammable vapors may reside <br /> during excavation or after removal. <br /> 2 . Drain and flush all piping into tank. Flammable or <br /> combustible free standing liquid production stock will be <br /> 7 <br />