My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
541
>
2300 - Underground Storage Tank Program
>
PR0521413
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:13:15 PM
Creation date
11/5/2018 12:47:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0521413
PE
2381
FACILITY_ID
FA0014535
FACILITY_NAME
JAMES KING TRUST
STREET_NUMBER
541
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95207
APN
12715033
CURRENT_STATUS
02
SITE_LOCATION
541 HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\541\PR0521413\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFIC,& 'E <br /> ProjectLCtation 541 E. Harding Way, Stockton, CA <br /> Owner James ,King Trust Phone No.(209)951-5001 <br /> Contractor Jim Thorpe Oil , Inc. phone No.(209)368-6175 LicenseNo495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following matenals was <br /> placed in the excavation in 12" lifts: <br /> X A. Pea gravel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes trade of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 oallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Bui'ding Code <br /> Appendix Chapter 70. <br /> Jim Thorpe Oil, Inc. <br /> x by Richard Thorpe , Vice Pres. <br /> Name (Print) <br /> x <br /> Contractor <br /> ne( ) <br /> x <br /> signature <br /> x Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.