My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
541
>
2300 - Underground Storage Tank Program
>
PR0521413
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:13:15 PM
Creation date
11/5/2018 12:47:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0521413
PE
2381
FACILITY_ID
FA0014535
FACILITY_NAME
JAMES KING TRUST
STREET_NUMBER
541
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95207
APN
12715033
CURRENT_STATUS
02
SITE_LOCATION
541 HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\541\PR0521413\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a. Describe the method that will be utilized to purge andlor Inert the tank(sx <br /> Dry Ice will be added to the tank(s) at the rate of 2011 per 1000 gal <br /> capacity Tor waste oil ana clieseltanks and 30# per 1000 gal. Gas. <br /> b. TankMplug Hauler. <br /> Name Jim Thorpe 0I1 , Inc. <br /> Address P.O. Box 357 City Lodi, CA Zip 95241-0357 <br /> Phone No.( 209 368-6175 <br /> _ <br /> Hauler Re&tyMtlnnanfhanlaaaahazardous) 2667 <br /> C. TankMprngDisposal Site: Erickson Environmental or Schnitzer Steel products. <br /> Name An appropriate decision will be made at the time of diposal , <br /> -brickson Is In kticilmona, ca, Sennitzer is an Rancho Cordova, CA <br /> Address 12000 Folsom Blvd. , Rancho 6jordova, CA Zip 95742 <br /> Phone No{ 916 ) 985-4810 <br /> SPA IDB(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES[K NO[] <br /> 9a. Describe,in detail,how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> Samples will be taken at least two to three feet under the former tank <br /> location with the backhoe. Soil samples will be taken from the bucket. <br /> Water same es, it necessary, will e taken wita a bailer. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Backfill of the excavation will be done at the appriate time during this <br /> project . Backfill material will consist of the excavated material and <br /> other clean compactable material. <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> 3 mil plastic sheeting. <br /> b)What will be the final destination of the excavated stockpile? <br /> If the stock pile is contaminated, a decision based upon the contaminate , <br /> levels of said contamination and quantities of soil as to the final disposE <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> NameJlm Thorpe Oil , Inc. Hauler Registration# 2667 <br /> Address P.O. Box 357 City Lodi, CA Zip 95241-0357 <br /> PhoneNo.( 209 ) 368-6175 <br /> EH 23 046(Revised 08113199) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.