My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
541
>
2300 - Underground Storage Tank Program
>
PR0521413
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:13:15 PM
Creation date
11/5/2018 12:47:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0521413
PE
2381
FACILITY_ID
FA0014535
FACILITY_NAME
JAMES KING TRUST
STREET_NUMBER
541
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95207
APN
12715033
CURRENT_STATUS
02
SITE_LOCATION
541 HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\541\PR0521413\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK RE OVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 -4 feet. If contamination <br /> is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5)working days <br /> pursuant to California Health&Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> N (Gallons) of SOIL SAMPLES <br /> , < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000- 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> 1 PIPING AND STOCKPILE <br /> �I yj LtSS°N.py., <br /> 9 PIPING SOIL SAMPLES 1 Sample every 20 lineal feet A; <br /> x TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER <br /> # (Gallons) of SOIL SAMPLES SAMPLES of WATER SAMPLES <br /> < 10,000 2 from wall next to tank <br /> Single Tank 3 ends at soil/groundwater 1 <br /> interface& 1 below tank <br /> > 10,000 OR 4 from wall next to tank <br /> ends at soil/groundwater <br /> Tank Cluster 5 or more interface& 1 below each I <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> EH 71046(Revised 08/13/99) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.