Laserfiche WebLink
�1ACKFILL EXCAVATION CERTIFICATF <br /> �.J <br /> Project Location 541 E. Harding Way, Stockton, CA <br /> Owner James.,King Trust Phone No.(209)951-5001 <br /> Contractor Jim Thorpe Oil, Inc. Phone No. (209)368-6175 LicenseNo.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.p , load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofpproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> Jim Thorpe Oil, Inc. <br /> . by Richard Thorpe, Vice Pres. <br /> Name t <br /> * Contractor <br /> «e <br /> * <br /> tgnature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />