Laserfiche WebLink
Sampling equipment, vehicle undercarriages, and tires should be steam or high <br /> pressure washer cleaned. The steam cleaner is a convenient source of hot water for <br /> personnel and protective equipment cleaning. <br /> 6.10 = SAFETY <br /> Smoking and open flames are strictly prohibited at sites under investigation. Work shall stop <br /> during electrical storms at the discretion of the SSO. A 10 pound type ABC fire extinguisher <br /> will be immediately available at all times during intrusive field activities. <br /> 6.11 1NERTING OF TANKS <br /> Prior to commencement of work on the site, the subcontractor will submit details on the <br /> procedures to be followed to WC. These procedures will be compared to API <br /> Recommended Practice 1604, Second Ed. 1987 as revised March 6, 1989, Removal and <br /> Disposal of Used Underground Petroleum Storage Tanks. If the firm's procedures, <br /> especially those addressing removal/inactivation of flammable vapors, disagree substantially <br /> with API's procedures, the WC PM will require the subcontractor to amend the procedures <br /> so that they agree with the API. <br /> 6.12 BURIED AND OVERHEAD UTII,ITIFS <br /> The location of overhead and buried utility lines will be determined by the subcontractor, <br /> before excavation begins, and their locations will be noted on site plans. <br /> When the back hoe is positioned near an overhead line, the rig operator should be aware that <br /> power lines can be moved toward the backhoe by wind. When necessary and approved by <br /> the PM and the utility, power lines may be shielded, shut down, or moved by the appropriate <br /> personnel. <br /> 90500000 H:\HEALTH\FNLHSP April 21, 1997 <br /> FEMA UST,Fuel Generic HSP 20 <br />