Laserfiche WebLink
SAN JO IN COUNTY ENVIRONMENTAL REALrMEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ L NEW PLAN ❑ 2.CHANGE OF INFORMATION 701. <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. Moz. <br /> (Check one item only) ❑. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> w - _ '" I. FACILITV INFORMATION <br /> FACILITY IO#(Agency Use Only) <br /> ysF# <br /> FACILITY NAME ( S v p LA mm. <br /> FACILITY SITE ADDRESS 15c CC S . -A A 1 /t N yh sto^ CITY rly, G� f?3 o Mos. <br /> H. EQUIPMENT TESTING G ANDY PREVENTIVE'MAINTE AN!I E J J <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually, hichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 2111.ANNUALLY ❑ 99.O"PHLR f1)� <br /> (S eci M67 <br /> P <br /> z IIL MONITORING-LOGATIONS�, _ <br /> This monitoring plan must include a Site Plan showing the general tankand piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). Ifyou already have a diagram(e.g.,curentUST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> ORING IS PERFORMED USING THE <br /> FOLLOWING METHOD(S):(Check all.that apply) ulo. <br /> CONTINUOUS ELECTRONIC MONITORING OFF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: t)ye..DRY ❑. b.LIQUID FILLED ❑. c.UNDER PRESSURE ? ❑ d.UNDER VACUUM M11- <br /> PANEL <br /> II.PANEL MANUFACTURER: &4&g Z"-r/ M12. MODEL#: !'A ora�dflo/(9/JD/XJr1 M13. <br /> LEAK SENSOR MANUFACTURER: L ZegaH M14. MODEL#(S):-.t^7/RL dp76.C3S'v'a! M1s. <br /> ❑ 2.AUTOMATIC.TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WA i_L TANK(S) e3� <br /> PANEL MANUFACTURER: M16. MODEL 4: M17. <br /> IN-TANK PROBE MANUFACTURER: Mla MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑. b.DAILY/NIGHTLY ❑ c.WEEKLY Mzo. <br /> ❑ d.MONTHLY ❑.e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b..0.2 g.p.h. ❑ c.OTHER(Specify): M�2 M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑. &MANUAL PER 23 CCR§2646 ❑. b..STATISTICAL PER 23.CCR§2646.1 M>A <br /> ❑ 4..WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a..ANNUALLY ❑. b.BIENNIALLY ❑. c.OTHER(Specify): M26. M27. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Rs,.,,.agency appmval) <br /> ❑ 99.OTHER(Specify). >rzs. <br /> %PIPE MONITORING_ <br /> PORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) ni30 <br /> CONTINUOUS ELECTRONIC MONITORING 0 PIPING SUMP(SYTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: DRY ❑ b.LIQUID FILLED ❑.c.UNDER PRESSURE ❑ d.UNDER VACUUM M1O1 <br /> PANEL MANUFACTURER: YLIEZE12ho�-f� nnz. MODEL H: Koli <br /> LEAK SENSOR MANUFACTURER: �"I�,rw- M M34. MODEL#(S): Mss. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? a.YES ❑.b..NO MJ6. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC.PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Ms7. <br /> ❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS. 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): Mia. MODEL#(S): W9. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g,p.h..LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b..MINIMUM ANNUAL 0.1.g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑. a YES ❑. b..NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑. b..NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑.a.ANNUALLY ❑ b.EVERY 3 YEARS. ❑. c..OTHER(Specify) M45.. MU. <br /> ❑ 5.VISUAL MONITORING DONE: F-1 a.DAILY ❑.b.WEEKLY' [1.c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED-* M47. <br /> 'Regwrnsagmi Wrnv ••.A].o formo wingofunburid..menry generumr fuel pipinaonlyper MC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mos. <br /> SJCEIID-d(07/03)-1/4 07/23/03 <br />