Laserfiche WebLink
*Moe N"801 <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> Donna K.Henan,R.E.H.S. SAN JOAQUIN COUNTY <br /> Unit Program Coordinators <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman, R.E.H.S. <br /> _ Stockton, California 95202 Mike Huggins, R.E.H.S., R.D.I. <br /> Margaret Lagorio, R.E.H.S. <br /> • �q�lRoaN:Y• Laurie A.Cotuila, R.E.H.S. Telephone: (209)468-3420 Robert McClellon, R.E.H.S. <br /> Assistant Director Fax: (209)468-3433 Jeff Carruesco, R.E.H.S. <br /> Kasey Foley, R.E.H.S. <br /> APPLICATION FOR PERMIT TO CLOSE <br /> UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br /> 1. GENERAL INSTRUCTIONS: <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br /> applicant with comments. <br /> 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets, <br /> adjacent properties(north toward the top of the page), nearby septic tanks, leachfields,water wells,buildings, underground <br /> public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from tank to dispensers. If <br /> underground utilities are not included on the site map, you must state in writing that USA Dig will be contacted prior to <br /> excavation activities. <br /> 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". Fot : Sampling firm shall be <br /> an independent third party from the contractor. <br /> 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> bQ 5. Submit a"Service Request" form with the appropriate fees, submit completed UPC forms for Facility and Tanks <br /> (formerly State A&B forms)and complete the"Underground Storage Tank Program Fee Worksheet". <br /> [] 6. Complete all questions on page 10, the Environmental Health Department (EHD) "Underground Storage Tank <br /> Disposition Tracking Record",except those requiring a signature and date of tank removal. The holder of the permit shall <br /> be responsible for ensuring that this form is completed and returned to EHD within 30 days of the tank removal. <br /> [] 7. Submit a "Site Health& Safety Plan" as an addendum to this application,to address all potential hazards for this <br /> specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> [] <br /> S. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the <br /> County of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the Uniform <br /> Building Code STD 70-11. <br /> [] 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to EHD approval of <br /> the closure plan. <br /> [] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed plan. If <br /> gross deficiencies are identified,an addendum will be required with a$95.00/hour fee and the review will begin on the date <br /> of resubmittal. <br /> [] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br /> [] 12. Advance inspection notice of at least 48 hours is required by EHD. <br /> [] 13. Submit Contingency Plan for over-excavation at time of UST removal(if planning to over-excavate). <br /> See"Ill. SITE NUTIGATION"on Page 2. <br /> EH 23 046 (Revised 11/21/06) 1 <br />