Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM ro <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(2o9)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FAC IL <br /> ITYNAME p DATE 7I//el -- <br /> FACILITY ADDRESS !7/04 . / �e�.s.�► �o Gf�/' 9: a <br /> l.Name(s) and Titles)of the people responsible for performing the monitoring and/or maintenance <br /> 1�0 1•✓. <br /> 2.Describe.the frequency of performing the monitoring for: <br /> TANKS l.vTi•�a� 7,rr��%r73�1�vi���d <br /> �vTaru��(S <br /> PIPING %v; s:ii�i� ,✓o.,.i�oc.-,r6 <br /> 3.Describe the location(s)of where the monitoring will be performed. ie: location of sensors <br /> 4.Describe the following equipment for each underground storage tank <br /> Name and Model of Monitoring Panel Eu& ^ 47 <br /> Name and Model of Line Leak Detectors GQ&Z_ <br /> Name and Model of Annular Sensors <br /> 2-S 0 <br /> Name and Model of Piping Sensors <br /> Name and Model of Dispenser Sensors o�U <br /> Type of overfill prevention <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes 0 No.® <br /> Does the turbine shut down if a sensor is disconnected? Yes 0 Nod <br /> Does the turbine shut down is the monitoring panel loses power? Yes 0 No; <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> ?.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? �a1A4E <br /> Note.For new installations the secondary containment must be tested 6 months after Installation.AIt secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. <br /> I:lmstLmi-1e1U5T1monitoringplan.doe <br /> ltz4l20o2 <br />