My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:44:41 PM
Creation date
11/5/2018 1:13:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOOD\5655\PR0540345\COMPLIANCE INFO 2016 - PRESENT.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification I <br /> F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is use r inv.ggntory control. <br /> ❑ Check this box if no tank gauging J 1TRon o�q�ARt is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitorinp�. <br /> Complete the following checklist: ENVIRONMENTAL HEALTH <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No* Was accuracy of system product level readings tested? <br /> ® Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ® Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ® No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h; ❑ 0.2 g.p.h. <br /> ❑ Yes ® No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> ❑ Yes ® No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes E No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ® No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ® Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ® Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Diesel PLLD failed line leak detector test. <br /> Parte 3 of 4 <br /> UN-036-3/4 www.unidoc.s.org Rev.01/17/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.