Laserfiche WebLink
q RECEIVED <br /> C ACiOpNH <br /> iFH OCT 0 3 2017 <br /> SPILL/OVERFILL CONTAINMENT BOXES ENVIRONMENTAL HE412 nf2 <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Tape Measure Equipment Resolution: <br /> Diesel Diesel Biodiesel <br /> Bucket Diameter: 12" 12" 12" <br /> Bucket Depth: 16.5' 16.5" 16.5" <br /> Wait time between applying <br /> pressure/vacuum/water and +/- 15 min +/- 15 min +/- 15 min <br /> starting test: <br /> Test Start Time: 9:15 AM 9:15 AM 11:00 <br /> Initial Reading(R,): 14" 14.5' 14.5" <br /> Test End Time: 10:15 AM 10:15 AM 12:00 <br /> Final Reading(Rr): 14" 14.5' 14.5' <br /> Test Duration: 60 min 60 min 60 min <br /> Change in Reading(R,-R,): No loss No loss No loss <br /> Pass/Fail Threshold or <br /> PASS=No Loss in 60 minutes <br /> Criteria: <br /> Test Result: X Pass O Fail X Pass OFail X Pass OFail 1 O Pass 0 Fail 0 Pass ❑Fail 0 Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />