Laserfiche WebLink
" E07' NED <br /> Comments: SCHEDULED GROUP TRAINING ON <br /> 10-3-2017 C! `' 3 201( <br /> 1. ALL SUMPS WERE VISUALLY INSPECTED AN"49IU"Tf)ZE_DRV'. <br /> ARii FREE OF =° <br /> DEBRIS. <br /> _2.THE ALARM ON 8/7/2017 SENSOR 28 FUEL ALARM_; RESPONSE CALL <br /> THE SERVICE COMPANY. AFTER REVIEW OF SERVICE LOG, ATTACH <br /> COPY TO REPORT. FAX COPY TO RYDER WHEN COMPLETED WITH <br /> SERVICE REPAIR <br /> ORDER <br /> _3. HOSE LEAK ON PUMP 3 MASTER SECOND MONTH AND STILL <br /> LEAKING <br /> _4. FOUND SLUDGE IN CATCH BASIN PLEASE ATTACH RECORD OF <br /> CLEANING OF SAID CATCH <br /> BASINS <br /> Items Requiring Follow-Up Actions: <br /> Instructions: <br /> 1nnn <br />