Laserfiche WebLink
DIAMOND Z <br /> V ENGINEERING , INC. <br /> WORK IN PROGRESS REPORT <br /> Program: FedEx Ground Fueling Date of Inspection: 2/13/2018—2/14/2018 <br /> Location: Tracy, CA Arrived on-site: 5 PM (2113) 9 AM (2114) <br /> Weather: Clear and cool Primary Contractor: Harco <br /> DZE Inspector: Dean Wise Contractors Representative: Gary Hollis <br /> o Site Walk Over—No problems noted <br /> u Work-In-Progress Inspection— <br /> 2113 Arrive onsite to observe shield installation to all dispenser sumps <br /> The short side shields were installed without screws due to the electrical conduit conflict. Gary <br /> Hollis called Micah Nelson of Bravo to inform him of the conduit issue. Micah Nelson approved <br /> installation without screws on short side shields <br /> 2114 Arrived onsite and photographed all shields installed (see Photo Log below) and awaited the <br /> arrival of the San Joaquin County Environmental Health Dept. Inspector. <br /> Betty Ho, County Health Dept Inspector, visually inspected all dispenser shield installations. Site <br /> passed inspection <br /> Inspection Report was issued by Betty Ho (see attached) <br /> ❑ Open Issues/Problems— No open issues <br /> PHOTO LOG <br /> fid"' <br /> FecEx- <br /> 1. Dispenser 1 Master side 2. Dispenser 1 Master sump <br /> IlPagr <br />