Laserfiche WebLink
SAN JOAQUIN COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />1610 E VWZELTON AVE. STOCKTON. CA 95205 <br />DEVELOPMENT SERVICES PHONE 12091 4683120 <br />PLANNING PHONE (2091468-3120 <br />BUILDING PHONE 12091 4683123 <br />NEIGHBORHOOD PRESERVATION PHONE (209) 4663021 <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location Vbh 13u KI'r [4i✓K <br />Owner`! l TIFF 57TL IOf j Phone No. <br />Contractor /�%e,5%/G TPG�4Yl0�( f�hone No. 7Jy-)1q-1300 License No. /�✓�G�$Q,'�% <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />2. Submission of verification, e.g. load ticket, within 30 days of project <br />completion that one of the following materials was placed in the excavation in <br />12" lifts: <br />A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />H. Crushed rock - self -compacting material not more than three-quarters <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />* �B�idPi� jh'rUr«G 1 - <br />Name (Print) <br />�7�7e I(-- <br />Tiitle'(Print) <br />'Signature <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/BECERT.DOC <br />