My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
342
>
2300 - Underground Storage Tank Program
>
PR0517393
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 2:00:59 PM
Creation date
11/5/2018 1:35:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0517393
PE
2381
FACILITY_ID
FA0013397
FACILITY_NAME
CAN CUN RESTAURANT PARKING LOT
STREET_NUMBER
342
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
342 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HUNTER\342\PR0517393\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�J <br />& a. Describe the method that will be utilized to purge and/or inert the tank(sy <br />After triple rinse and removal of all residual, h nk will <br />be inerted by adding dry ice at the rate of .Oil's per 1000 gal. <br />capacity for diesel and 30 #I s per 1000 gal gasoline. <br />b. TaokMiping Hauler. <br />Name,Jim thorns Oil � Tnc. <br />Address P_O. Rnx 3,7 Clty--Lalli 23P a52a7_n��7 <br />Phone No{ 9Og 1 3fiR-1717, <br />Hauler Registration #Cif hauled as hazaedous) a v <br />C. TankiMping Disposal Site: <br />Name Schnitzer Steel Products <br />Rancho <br />Address 12000 Folsom Blvd. CityCordova ZIp95742 <br />Phone No! 916 1 985-4810 <br />EPA D1# Of transported to a permitted TSD facility) N / A <br />Is the sampling firm an Independent third party from the contractor? YES I IC ND [] <br />9a. Describe, In detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />The approved sampler will extract soil samples from the backhoe bucket. <br />Soil to be sampled will be taken from native soil at least two feet <br />directiv under the fill or product supply end of the tank. <br />10. Describe how the excavation will be backfilled with suitable material upon removaL• <br />A determination of the proper material and method -of back fill will <br />be made after the size of the excavation and its location has been <br />confirmed. Backfill will conform to all local regulation. <br />11. Handling of excavated soil - <br />a) What material will be used to Ibis the tank pit and cover the stockpile? <br />3 Mil plastic sheeting <br />b) What will be the final destination of the excavated stockpile? <br />If the stockpile is determined to be clean it will be returned to the <br />excavation, If not clean it will be disposed at a proper facility. <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name .Tim mhnrp o (li l I Tnn. Hauler Registration# 7RF37 <br />P.O. Box 357 <br />Phone No.l 209 1 368-6175 <br />City Lodi, <br />EH 23 046 (Revised 10119198) Page 5 <br />Zip 95241-0357 <br />
The URL can be used to link to this page
Your browser does not support the video tag.