My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUTCHINS
>
2525
>
2300 - Underground Storage Tank Program
>
PR0231337
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2021 12:56:59 PM
Creation date
11/5/2018 1:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0231337
PE
2381
FACILITY_ID
FA0000894
FACILITY_NAME
TOKAY MARKET FOOD & LIQUOR
STREET_NUMBER
2525
Direction
S
STREET_NAME
HUTCHINS
STREET_TYPE
ST
City
LODI
Zip
95240
APN
06024007
CURRENT_STATUS
02
SITE_LOCATION
2525 S HUTCHINS ST 12
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HUTCHINS\2525\PR0231337\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW %.,/ <br /> I. INTRODUCTION <br /> The purpose of this Site Safety Plan is to establish requirements for protecting the health <br /> and safety of employees, contractors and subcontractors during the soil excavation and <br /> removal of underground storage tanks at Star Market 2525 Hutchins St.,Lodi, California. <br /> This plan describes hazard information and health and safety procedures to be followed by <br /> all designated field personnel during the soil excavation and tank removal operations. <br /> II. FACILITY BACKGROUND/WORKPLAN <br /> A. Address <br /> 2525 Hutchins Street, Lodi, California <br /> B. Location <br /> The approximately 5 acre site is located 2.0 miles west of Highway 99. The exit <br /> off of highway 99 is Harney Lane. The site is on the northwestern corner of <br /> Harney Lane & Hutchins Street. <br /> C. Schedule <br /> Excavation and removal of the U.S.T's will require approximately 2 days to <br /> complete. Tank removal is expected to take place during the week of September <br /> 30, 1996. Once tank removal is completed, the excavation will be backfilled with <br /> a pea gravel and base rock compaction. All construction activities to be conducted <br /> during daylight hours (approximately 8:00 a.m. to 6:00 p.m.). <br /> D Operation <br /> Field activities include the use of heavy equipment for the excavation, stockpiling <br /> of the soil, tank removal via a crane, backfilling and compaction of the excavation <br /> and eventually the asphalting of the surface area. <br /> III. KEY PERSONNEL AND RESPONSIBILITIES <br /> Predesigned field investigations will be performed by DEL TECH and their associates. <br /> Actual excavation activities will be completed by Del-Tech. DEL TECH will be on-site <br /> to complete all construction activities, and will be responsible for project management. <br /> Sherwood Analytical Laboratory, in Hilmar, California will be responsible for the analysis <br /> of all soil samples collected. The project manager for DEL TECH will be Don Light. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.