My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2300 - Underground Storage Tank Program
>
PR0231636
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 1:35:34 PM
Creation date
11/5/2018 2:59:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231636
PE
2381
FACILITY_ID
FA0003869
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTION*
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23912001
CURRENT_STATUS
02
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KASSON\23500\PR0231636\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*A,/ <br /> IL GENERAL INFORMATION: <br /> 1. Obtain an EPA Site Number from the Department of Toxic Substances Control (800) 61-TOXIC for <br /> temporary hazardous waste removal activities associated with underground storage tank(UST) removals. <br /> 2. Disposal Information: Public Health Services Underground Storage Tank Disposition Tracking Record <br /> (UST Tracking Record, page 10) shall accompany each tank removed from site. Timk(s) will be issued <br /> an identification number which PHS-EHD's representative will nae on the UST Tracking Record. <br /> COnua"Or will affix same identification number onto tank end using fluorescent spray paint. Contaminated <br /> tanks and/or piping are to be transported under Hazardous Waste Manifest by a state registered hazardous <br /> waste hauler. <br /> 3. Contractor to Provide: Combustible/Flartunable gas detector(to verify the Lower Explosive Limit(LEL) <br /> atmosphere and oxygen level of tank prior to lifting from excavation), adequate number(s)and appropriate <br /> type(s) of fire extinguisher(s), barriers to secure the area as necessary to minimize traffic and pedestrian <br /> interference, and fluorescent spray paint to affix tank identification numbers. It shall be the project <br /> manager's respousibility for compliance with all health&safety regulations and requirements, which shall <br /> be strictly adhered to at all titins during the course of the closure activities. <br /> 4 The PHS-EHD permit shall be on site during tank excavation and removal. <br /> 5. Any changes in this document shall be approved by PHS-EHD prior to initiating work. <br /> 6. Closure-in-Place If Closure-in-Place is the suggested method of abandonment, complete form <br /> EH 23 039 and submit written approval from the local Fire Department. <br /> 7. Temporary Closure If Temporary Closure is the suggested method of abandonment, complete <br /> and submit this form and a written approval from the local Fire Department. <br /> 8. The following documentation shall be submitted within 30 days of the tank removal <br /> [late: <br /> a) Analytical results, mailed directly from laboratory to PHS-EHD, including a chain of custody and <br /> quality assurance and quality control(QA &QC). <br /> b) UST Tracking Record Sheet(s) and/or Tank Hazardous Waste Manifest(s). <br /> c) Hazardous Waste Manifests for piping, rinsate, residual Net, or wane oil receipt. <br /> d) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated <br /> City Building Departments. This report will be referred to the appropriate agency for their <br /> review. <br /> A site which has had UST(s) removed, shall not be considered for final closure until the above iteral <br /> are submitted for review, <br /> HI. SITE MITIGATION: <br /> 1. In the event contamination is obscrvcd, confirmed or suspected as a result of a leaking UST system it is <br /> the responsibility of the owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior <br /> to initiating any assessment or rcmediation activities. To minimize delays. a Corrective Action Plan may <br /> be submitted concurrent with tank closure or installation plans. Address one copy of the Corrective Action <br /> Plan to the Site Mitigation Unit for review For further assistance contact the Site Mitigation Unit at(209) <br /> 468-3450. <br /> EH Z3 046 (Revised 10/24/97) Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.