Laserfiche WebLink
2-11-1998 10: 16AM FROM ART INC. 9164319360 P. d <br /> *40e Vim►' <br /> 4_ DESCRIPTION OF FIELD ACTIVITIES <br /> The Scope of Removal Field activities will include excavation and removal of one 350 gallon diesel <br /> UGST, one 2,000 gallon diesel UGST, one 2,000 gallon unleaded gasoline UGST, one 5,000 gallon <br /> diesel AGST and one 10,000 gallon diesel AGST. <br /> The Scope of the Install Field activities will include the installation of one 5,000 gallon aboveground <br /> tank (3,000 gallons gasoline and 2,000 gallons diesel). Tank accessories will include 2 dispensors, <br /> with all necessary piping, valves, fittings and signs. <br /> 5. HAZARD CONTROL <br /> GENERAL SAFETY EQUIPM4ENT REQUIRED <br /> first Aid Kit MS,11 Kit �/ ^'// <br /> Q"uWv Nupphcs Fire Extinguishers LKon-Sparking Toals 1C13ir1dmg Chps/('rrouzi&Wim� <br /> C SpecilicHvwdWarningSigns(NOSMOKING) <br /> vNncadcs andkx Portable Fencing. <br /> 00ther <br /> PROTECTIVE EQUIPMENT REQUIRED(Nate BES Uniform,Safety Shona&Snfeiy(ilarses with side shield+required on alllohe) <br /> ._Mark Destgnaled Activity and Use Required Equipment wSpecified in BESSOFs: <br /> E (anWlled Site Entry <br /> Safetv Glasses <br /> Hard Flat(ac m-Cd d) <br /> Steel Toe-Steel shank work boots <br /> Ram-Cies as required <br /> SPECIAL INSTRUCTIONS- <br /> NO DENIM TO BE WORN AS THIS IS A CORRECTIONAL FACIITY <br />