My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2300 - Underground Storage Tank Program
>
PR0231636
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 1:29:50 PM
Creation date
11/5/2018 2:59:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0231636
PE
2381
FACILITY_ID
FA0003869
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTION*
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23912001
CURRENT_STATUS
02
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KASSON\23500\PR0231636\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
6/18/2013 8:00:00 AM
QuestysRecordID
175715
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br />,fty F99MV0b <br />JAPJ 12 19,9 <br />ENVIRO,;NIENTAL HEALTH <br />PERMIT / SE.RViCES , <br />Soil samples will be taken by authorized personnel employed <br />by the recognized laboratory under the direction and super- <br />vision of the local County Health District. The sampling <br />will be taken when the tank is removed from the hole. Soil <br />analysis will consist of the following as referred to in <br />"Sampling Protocol for Tank Removals". <br />WATER NOT PRESENT IN TANK PIT: <br />Tank Size (A) 0 to 1,000 gallons a minimum of one soil <br />samples will be taken from either the pump <br />or the fill end of the tank, below bottom <br />of tank. <br />(B) 1,001 to 10,000 a minimum of two soil samples <br />will be taken. One sample from each end of <br />the tank, below bottom of tank. <br />(C) 10,001 and up a minimum of three soil samples <br />will be taken space evenly along the length <br />of the tank, below bottom of tank. <br />WATER IS PRESENT IN TANK PIT: <br />Tank Size (A) 10,000 gallons or less (single tank) the <br />minimum number of soil samples will be <br />two from the tank wall at each end of soil/ <br />ground water interface. The minimum number <br />of water samples shall be one. <br />(B) 10,001 and larger tank, or a cluster of <br />tanks the minimum number of soil samples <br />to be taken shall be four, one from each <br />wall at soil/ground water interface. A <br />minimum of one water sample shall be taken. <br />Lr;�, - fYrn ��c <br />
The URL can be used to link to this page
Your browser does not support the video tag.