Laserfiche WebLink
SAN LUISCLCE44CEo00,MF 4MAS01044pd <br /> TANK PIPING CONSTRUCTION COMPANY, INC. <br /> P. 0. Box 245 a 825 26th St. <br /> PASO ROBLES. CALIFORNIA 93446 DATEno. <br /> June 8 oe 1984 2586 <br /> ATTENTION <br /> (805) 238.0888 Jim Miller <br /> flE: <br /> TO San Joaquin Local Health Department alley Tomato <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> GENTLEMEN: <br /> WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items: <br /> ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications <br /> ❑ Copy of letter ❑ Change order ❑ <br /> COPIES DATE NO. DESCRIPTION <br /> 2 Sen Tank and Location Drawings <br /> THESE ARE TRANSMITTED as checked below: <br /> ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval <br /> ❑ For your use ❑ Approved as noted ❑ Submitcopies for distribution <br /> LNXAs requested ❑ Returned for corrections ❑ Return corrected prints <br /> ❑ For review and comment ❑ <br /> ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US <br /> REMARKS <br /> COPY TO <br /> SIGNED: ENGINEERING DEPARTMENT <br /> Form 156 If enclosures ere not as noted, kindly notify us at once. <br />