My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
950
>
2300 - Underground Storage Tank Program
>
PR0504033
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 4:59:05 PM
Creation date
11/5/2018 3:02:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0504033
PE
2381
FACILITY_ID
FA0006056
FACILITY_NAME
MOHR-FRY RANCHERS
STREET_NUMBER
950
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
950 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\950\PR0504033\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
6/7/2013 8:00:00 AM
QuestysRecordID
170038
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J OAQU I N LOCAL HEALTH D I S TR I CT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall be representative of native soils beneath the tank's <br /> invert [tank's bottom] at- a collection depth not be exceed 2 - 4 feet. If contamination' <br /> is documented during closurean Unauthorized Release notification must be filled out and <br /> Lys.submitted to SJLHD within 5 Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Fill or pump end of tank <br /> 1000 - 10,000 gallons TWO per tank One at each end of tank <br /> 10,001 gallons and up THREE OR MORE Ends and Middle or <br /> per tankgenerally spaced along <br /> the length of the tank <br /> Piping ONE EVERY 20 LINEAL FEET <br /> WATER IS PRESENT IN TANK PIT <br /> TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br /> SOIL SAMPLES SAMPLES OF WATER SAMPLES <br /> 10,000 GALLONS From wall next to <br /> OR LESS tank ends at soil/ <br /> (Single Tank) TWO groundwater ONE <br /> interface <br /> GREATER THAN From wall next to ONE <br /> 10'000GALLONSI tank ends at soil/ <br /> OR groundwater <br /> TANK CLUSTER FOUR interface <br /> OTHER S PEC I AL GOND I T I ON S <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples. (Physical removal of the <br /> obstruction will then allow sampling according to the above conditions. ) <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> _— SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tankgenerally spaced along <br /> Ne length of the tank <br /> EH 23 047 12/68 <br /> REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.