Laserfiche WebLink
Name of Supplier,Owner or Dealer Address No.and Street($) City Stat. Dare of Tem <br /> y� 15. TANK TO TEST 16. CAPACITY From <br /> Z X Station Chart <br /> AID <br /> A rt / DOU By most accurate Tank Manufacturer's Chart <br /> I C Nominal Capacity (/� capacity chart available �/� <br /> N O Identity by position Gellom Gallon^ Company Engineering Data <br /> M <br /> Is there doubt as to True Capacity? E Charts supplied with pptFO TI}P <br /> �f /`Ic c�iYJi U �T <br /> I*I Brand and Grade Sae Section"DETERMINING TANK CAPACITY" Other <br /> ` 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to bk in. Gallons ea.Reading <br /> A" Cf <br /> Stick Water Bottom / y <br /> before Fill-up / _ // Inventory -- � <br /> to%In. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> .yZ o <br /> 0 Tank Diameter C— Product In full tank(up to fill pipe) <br /> � <br /> DOo J <br /> to C DO 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK O=SL.(o 4T�r9° —_,5_3-9 VAPOR RECOVERY SYSTEM <br /> I 0 00> See manual sections applicable.Check below and record procedure in log(26). ® Stage I <br /> Z 05 <br /> C Y G9 Water In tank High water table in tank excavation F] Llri being tested with LVLLT ® Stage II <br /> ITT <br /> n0i 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> N19. TANK MEASUREMENTS FOR Is Today warmer?I 1 Colder?I)_-F Product in Tank—'F Fill-up Product on Truck—°F Expected Change( + or - ) <br /> TSTT ASSEMBLY G <br /> Dt Bottom of tank to Grade*.................... 133 y�L /L037 ��/J�/ -F <br /> m 22. Thermal-Sensor reading atter circulation <br /> J Add 30"for 4"L ................. .36 agent Nearest <br /> L Add 24"for 3"L or air seal ....... 23. Digits per-F in range of expected change 3/D <br /> agent <br /> Total tubing to assemble Approximate <br /> 20. EXTENSION p e HOSE SETTING 24. �n. Q53 x 000B9oz9 = 9/S3 gallons <br /> Tank ro to grade' ............ 89 38�2 rr total U2, Fn coefficient of expansion for volume change in this tank <br /> full tank(16 or 17) Involved product per°F <br /> Extend hose on suction tube 6"or more [� <br /> 7 below tank top ..................................... / L rr 25. -YS/g(o`...i.3 3/9, = D/OR.SSZ This is <br /> Svolume change per°F(24) Digits per-F in test Volume change per digit. test <br /> If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. VOLUME MEASUREMENTS Ih 34' TEMPERATURE COMPENSATION 36.NET VOLUME 39. ACCUMULATED <br /> LOG OF TEST PROCEDURES PRESSURE RECORD to.001 fdl. USE FACTOR(a) CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27. 28. 29. Standpipe Level 32. Temperature At Xleh te$el record <br /> r in Inches Product vee Product 35. 36Change 3 Computation Adjustment Total End Deflection <br /> gA[ Record details of setting up geadine Graduate Replaced l-1 <br /> Thermal Nigher+ (c) x (a)= Volume Minus <br /> and running test.(Use full No. Beginning 'arm to Sensor Lower- Expansion+ E$panm.a(+)or At Lao Lere campcte <br /> ( TIME length of line if needed.) of which Before After Product Reading (s) Contraction- Contraction(-) Cbnle per Mow <br /> Fq{(� Ile Art Reading Restored Reading Reading Recovered(*) k33(V)—d311T) (NFMA waarial <br /> ikt — <br />