Laserfiche WebLink
14. /-le fid <br /> Name al Supplier.Owner or Dealer Address No.and Sinet(s) City Sute Data of Teal ' <br /> y� 15. TAVK'TO TEST 16. CAPACITY IF�mm <br /> Z1,11 <br /> h % I 1< Station Chart <br /> X rt By most accurate Tank Manulactureis Chart <br /> -' � Nominal Capacity /Z, 600 capacity chart available �.�Z� <br /> y O 0. <br /> Identity by Position 'Gallons Gallons Company Engineering Data <br /> / 1 Is there doubt as to True Capacity? Chane supplied with pl-ront, <br /> h Bnnd end Duea Sea Section"DETERMINING TANK CAPACITY" ❑ Other v <br /> L <br /> 17. FILL-UP FOR TEST Slick Readings Total Gallons <br /> to V.in. Gallons ea.Reading § <br /> Stick Water Bottom <br /> before Fill-up „ _ Inventory A <br /> to K Ialiens ' <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY � 9iryls <br /> Co Tank Diameter 9S' Product In full tank(up to fill pipe) <br /> .0 <br /> WOOo _ <br /> w�o o 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK A®� -6-/ .4T S ° _J�J. 7 VAPOR RECOVERY SYSTEM <br /> A=XGo <br /> p-4 n See manual sections applicable.Check below and record procedure in log(26). <br /> Z�' Stage 1 <br /> ; <br /> O N Water In tank E] High water table in tank excavation [:] Line(s)being tested with LVLLT ® Stage II <br /> oy0 < <br /> m <br /> n0i 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK <br /> 19. TANK MEASUREMENTS FOR <br /> N TSTT ASSEMBLY Is Today Warmer?IJ Colder?I 1--F Product in Tank—°F Fill-up Product on Truck—*F Expected Change( t or 1 <br /> NBottom of tank to Grade's.................... 139//Z ” <br /> des 22. Thermal-Sensor reading after circulation //6Z S7/s� 'F <br /> Add 30"for 4"L ................. 30 _" dents Nearest <br /> Add 24"for 3"L or air met....... " 23. Digits per'F in range of expected change 3/7 <br /> Total tubing to assemble Approximate �G/f y/7 " dg,ls <br /> 20. EXTENSION HOSE SETTING 24. /z/� (] X . cwo,-599x9 = 7e76.?,f0� gallons <br /> y total uantity in weft tient of expansion for volume change in this tank <br /> Tank top to grade•...................... 3 ) yU'Z orTot <br /> tank(16 or 17) involved product per IF <br /> Extend hose on suctlon tube W or more <br /> below tank top ..................................... 5'67 25. 7.aGaP03Z 3i') = C7`l-9// This is <br /> 'If Fillvolume change per IF(24) Digits per IF in test Volume change per digit. test <br /> pipe extends above grade,use top of till. Range(23) Compute to 4 decimal places. lector(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39. <br /> LOG OF TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS(V) TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO.001 GAL USE FACTOR(a) EACH READING CHANGE <br /> 27. 28. 29. Standpipe Level 32. m <br /> 35. 36. 37. Tepera tun MI"lel ec <br /> At No" rall <br /> DATE Record details of settingU in Inches Product in Product Change Compuutipn Adjustment Taal End olftom <br /> P Read,,[ Graduate Replaced)-) Thermal <br /> and running test. (Use full No. Hip.,+ (c) n(e)a Volume Minus <br /> -- length of line if needed. Beginning 18,01 ito Semnr lower- Expansion i Expansion n I t At Low Len"tom., <br /> DMT O ) of which Beton After Produq Reading (c) Lantnnion - Contraction 7(T [han[A per Nour <br /> ❑c hr) Naatlinp Rnland Heading Raatlinp Recovered lel NDOh'1-d3TIT) INrPA"at erial <br /> D 30 Zee` <br /> a 2)V/r ./, e tec, >< 7;4 r 11 <br />