Laserfiche WebLink
A'- <br /> 14. �r�F o/ei <br /> H I Supplier Owner of Dealer Address No.and Stain(s) Cly state Date or Teat <br /> y� 15. TANK TO TEST 16. CAPACITY From e <br /> xIF B most accurate �I Station Chart e <br /> 0 Nominal Capacity_I Z 9200 Capacity Chart available / Tank Manufacturer's Chart <br /> Identity by position Gallons p Y Gallons <br /> E1�j� Company Engineering,Zm1 0 P Y ngineerin Data <br /> i, 9 Is them doubt as to True Capacity? El Ej <br /> Brand and Grade Charts supplied with PtahC T1}P <br /> See Section"DETERMINING TANK CAPACITY" ❑ <br /> AD Ocher <br /> Y 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to se in. Gallons ea.Reading <br /> Slick Water Bottom <br /> before Fill-up � _ Inventory I Zeii <br /> to%in. Gallons - <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> 'y3 <br /> D(a -0— Tank Diameter ,i5 Product In full tank(up to fill pipe) <br /> .0O0 <br /> Q o 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ,�j,BlSJp ff1�Si G 5 $;/ VAPOR RECOVERY SYSTEM <br /> '= x(D <br /> Z-i 0 See manual sections applicable.Check below and record procedure in log(26). <br /> cn 0 0 Stage I <br /> D0 [j Water in tank [_j High water table in tank excavation [:] Line(e)being tested with LVLLT Stage II <br /> om <br /> 0 <br /> N 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> 19. TANK MEASUREMENTS FOR <br /> Is warmer? o <br /> TSTT ASSEMBLY Y [] Colder. []—°F Product in Tank_'F Fill-up Product on Truck_r F Expected Change( + or i <br /> N <br /> Bottom of ink to Grade..................... 435 Z //4S/�i 5k�4 R <br /> 22. Thermal-Sensor readingafter circulation " <br /> Add 30"for 4"L ................. 0 —y F <br /> — digits Nearest <br /> Add 24"for 3"L or air seal ....... " 23. Digits per°F in range of expected change i Six <br /> Total tubing to assemble Approximate ........ �Uy i/Z. 'r digits I <br /> 20. EXTENSION HOSE SETTING 24• /Zo ( O x a. O2-)a00// = 9. 99339 e, gallons \ <br /> Tank top to grade'.................................. `/Q /Z r, total quanffty in coefficient of expansion for volume change in this tank <br /> Emend hose on suction tube 6"or more lull tank(16 or 17) Involved product per of <br /> below tank top ..................................... SZ7 /Z 25. 2.,"9933 qk. ..3i <br /> - + —_ <br /> "'i7 Z`��%)6�' This is <br /> volume chatgeeper'F(24) Digits F In test Volume change per digit. test <br /> 'If Fill pipe extends above grade,use too of fill. R nge(2) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. 34. W3,9.HET vgwME 39. <br /> LOG OF TEST PROCEDURES PRESSURE11 VOLUME MEASUREMENTS Iq TEMPERATURE COMPENCHANGES ACCUMULATEDCONTROL RECOAO i0.001 GRI. USf FACiOA IeICH PfA01NG CHANGE27. 2S. 29. Standpipe byel 32. 35. 36. $] Tam anconRecord details of settin u inmtae Pmduttin P At Ni h bed moreDUE g p Reading Graduate laced Il Change Adjustment Tont Ene DeflectionReplaced(-) Thermaland running test.(Use full NaHigher+ Iolume Minusginning Lend to Smmr Lower- Elength of line if needed.) ansion Al lm foal cora sTIME of whick Before After Product Reading (c) Cpansion(j of CAanDa pn Xou(H hr) Reading Bei aed Reading Reading Recoverd(+) ontra_637(T) INFPA lraerial <br />