Laserfiche WebLink
14. T.�iE is 'L Co / 4?S' rn e A4 -A c 2n F loa/ <br /> Name of Supplier,Owner or Dealer Address No.and Streets) city State Data of your <br /> gR 15. TANK TO TEST 16. CAPACITY From <br /> m <br /> Station Chan <br /> rt By most accurate ��.a q Tank Manufacturer's Chan <br /> Nominal Capacity /0= capacity chart available /0 ya 9 r ' <br /> (a <br /> Identity by position Gallons Gallons u Company Engineering Date T1 <br /> I Is there doubt as to True Capacity? ❑ E] Charts supplied with pe1Te TItP <br /> . QN)CA U Y/1 -""-'N <br /> ye Brand end Grade See Seetion"DETERMINING TANK CAPACITY" Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to V.In. Gallons ea.Reading <br /> Stick Water Bottom <br /> before Fill-up i _ go/ Inventory '- - <br /> to'X In. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter // Product In full tank(up to fill pipe) <br /> V' a tD -1 1B. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> L, x <br /> --4 O See manual sections applicable.Check below and record procedure in log(26). �?IE7r �� d "~ 53, <br /> // Stage 1 <br /> c = N G LVLL. <br /> nay E] Water In tank E] High water table In tank excavation � Lirle(s)being testedted witt LVL <br /> LT LT � Stage II <br /> D m <br /> 0 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK <br /> w 19. TANK MEASUREMENTS FOR Is Today Warmer?I I Colder?I7—°F Product in Tank_°F Fill-up Product an Truck—°F Expected Change( + or ) <br /> TSTT ASSEMBLY <br /> Bottom of tank to Grade .................... 13�S / <br /> - a /Z 22. Thermal-Sensor reading after circulation /OZ �O.S'/ L'U °F <br /> Add 30"for 4"L ................. .3a _" digits Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range of expected change '70/ <br /> Total tubing to assemble Approximate ........ .Z6T�" digits <br /> 20. EXTENSION HOSE SETTING 24. /J `� f x COOLS-i-,9,58 S 9y 3� gallons <br /> J N/Z total q _,lily In coefficient of expansion for volume change in this tank <br /> Tank top to grade....................... full tank(16 or 17) involved product per°F <br /> Extend hose on auction tube B"or more f /� <br /> below tank fop ..................................... 3 7 1 _" 25. s•94356,'3 This is <br /> volume change per°F(24) Digits per°F in test Volume change per digit. test <br /> °If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30, HYDROSTATIC 31. 34. 38.11IFT VOLUME 39. <br /> LOG Of TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS IT) TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO.001 GAL. USE FACTOR(a) EACH READING CHANGE <br /> 27. 28. 29. Standpipe Lml 32. 35. 36. 37. Temperature At High town record <br /> gAlf <br /> Record details of setting u in Inches Product in Product Change Computation AdimtmeM Tom EM oenee0m <br /> B P NeaaM Graduate Replaced(-) Thrmel Higher+ c <br /> and running test.(Use full No. Beginning Level to Senior g ( I O Volume Minus At I.term compete <br /> p g Lower- Eepemion + Expansion n I or) <br /> TOE length of line if needed.) of which Below Aller Prods_, Reeding (c) contraction- Conlradion(-) cnanae per Now <br /> IH AN Reeding Restored Reeding Reeding Recovered I+) 033(V)-0371?) (NFha crderul <br /> f <br />