Laserfiche WebLink
14 ✓ Pn� c ti (r Od 13.e19r fAm,� lrls-c �D t��oDi cliff ��f� - -- <br /> Name of Supplier.Own.,or Dalar Address No.and Streets) Chn, star. Data of Teat <br /> From <br /> 15. TANK TO TEST 16. CAPACITY <br /> Station Chan <br /> X eaMk By most accurate 'I' ��r�-_ L� Tank manufacturer's Chen <br /> -+ Nominal Capacity J��d d capacity chart available_ <br /> 44j O Identity by pomuon Gallons Gallons [ I Company Engineering Data <br /> f0 11E' <br /> .64 <br /> Is there doubt as to True Capacity? ( � Charts supplied with PP,R T <br /> elle <br /> I� Arend and Grade See Section"DETERMINING TANK CAPACITY" L Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to W In. Gallons ea.Reading <br /> Stick Water Bottom Z2� /S <br /> before Fill-upBottom <br /> _ Inventory <br /> 18 bS In. Gallons <br /> FIII up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY —� <br /> R <br /> Tank Diameter Product In full tank(up to fill pipe) <br /> r N L <br /> °co VAPOR RECOVERY SYSTEM <br /> c3 (Alo Us <br /> • 16. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK �,az39p tir.L(o� _ 6�3 <br /> XX <br /> -4a See manual sections applicable.Check below and record procedure in log(26). ,v//cs Tvn 6..Lc Stage I <br /> Z IP iv 7Og Water in tank � High water table in tank excavation F-1Lingle)being tested with LVLLT - it Siege II <br /> Som <br /> a m <br /> 0 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> N 19. TANK MEASUREMENTS FOR Is Today Warmer?17 Colder?[7—°F Product in Tank—°F Fill-up Product an Truck—°F Expected Change I + of - I <br /> N TSTT ASSEMBLY ? <br /> Bottom of tank to Grade•.................... faJ 22. Thermal-Sensor reading after circulation /a, 03Y 'F <br /> Add 30"for 4"L ................. choirs Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range of expected change .Jlp <br /> / drafts <br /> Total tubing to assemble Approximate ........ <br /> 20. EXTENSION HOSE SETTING 24. /.?./Co3 x nw t �� ' = 2 �4�3(�_9111 gallons <br /> 3// - total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade-.................................. full tank(16 or 17) Involved product per°F <br /> Extend hose on auction tube 6"or more <br /> below tank top ..................................... J / G 25. 9�� + -�/O = , Or' �L�yy This Is <br /> volume change per°F(24) Digits per°F In test Volume change per digit. test <br /> 'If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26, 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39. <br /> LOG OF TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS IR TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO 101 GAL USE FACTOR(a) EACH READING CHANGE <br /> 27. 28. 29. Standpipe Layer 32. Temperate,, M alk final"cord <br /> in Inchae Pmduct in Product 35. 3 Change 3 Computation Adjustment Tele)EM ganepllen <br /> OBF Record details of setting up paeag Graduate Replaced(—) Thermal Nigher+ e x a e -- <br /> end running test. Use full N,. let 1 I Wlume Minus At Le,tnel omemi" <br /> 9 ( Beginning Level to Semor Lewar- E.pemion+ Expansion(+)or <br /> Nal <br /> of line it needed.) of whish Befell After Product Heading Icl Contraction- Contraction I-) Chage par Near <br /> TSL Heading flattered Reading Reading Recorared l+I ,33M—e37fTl (NFPl crlledtl <br /> UN k.) <br /> -ri..w: Q� L -_(._- . _1 - _�i .--_ �dL'�d f• 1�I' �—t;�' _ti - _. ' __ — _ <br /> i <br /> -,o /torr ✓ L nir y,,).i :Jr/��� � �.. _ fY __ . _. _ _ _ __- <br />