My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
13475
>
2300 - Underground Storage Tank Program
>
PR0502118
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 2:20:46 PM
Creation date
11/5/2018 3:04:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0502118
PE
2381
FACILITY_ID
FA0005333
FACILITY_NAME
JACKPOT
STREET_NUMBER
13475
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
LODI
Zip
95240
APN
06326004
CURRENT_STATUS
02
SITE_LOCATION
13475 N JACK TONE RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\13475\PR0502118\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tttr <br /> PH ON E 2 8 5 - 2 4 0 0 <br /> CABLE ADDRESS: TIMOIL <br /> SEATTLE <br /> TACOMAM93 <br /> N <br /> PORTLAND <br /> STOCRENO 12 <br /> Los ANGELES �ETIME OIL COMPANY <br /> T' 2737 WEST COMMODORE WAY SEATTLE, WASHINGTON 98199-1233 <br /> P.O. BOX 24447,TERMINAL STATION SEATTLE, WASHINGTON 98124-0447 <br /> IM <br /> E <br /> June 9, 1988 <br /> San Joaquin Environmental Health <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> Dear Sirs: <br /> Time Oil Company has completed installation of overfill and overspill <br /> protection devices plus impressed current cathodic protection on three <br /> underground petroleum storage tanks and associated piping located at <br /> 13475 N. Jacktone Road, E. Lodi , CA 95240. <br /> In order to insure the integrity of the systems, upon completion of <br /> construction a petro tite precision test was performed. Results of the <br /> attached tests indicate that all systems tested tight. <br /> If you have any questions please do not hesitate to contact me. <br /> Sincerely, <br /> �v�e,t/� 1J�} <br /> Josh G. San�6 <br /> Loss Control Manager <br /> Attachments a/s <br /> JGS/jam <br /> 0142E JUN 141988 <br /> FI VIROMF-S H ES <br /> FERMIT/SERVIC <br />
The URL can be used to link to this page
Your browser does not support the video tag.