Documents prepared by Core v A
<br /> States Engineering are to be used � � rQFSS/Q
<br /> only for the specific project and �M 4 t�0 I_ I,�
<br /> C 0 R E
<br /> specific use for Which they are
<br /> N� CONTRAaTOR IS TO USE (4) intended. Any extension of use to ,
<br /> Other projects, b owner or an E r � AI ka�'
<br /> �;/ �� x 2.._1/4° GALVANIZED BOLTS MISCELLANEOUS LANEOU PARTS p a y y � � ��r� � � � �� a� �
<br /> WITH NUTS THAT ARE SUPPLIED WITH other party, Without the expressed, �, ? 1 X319
<br /> a_ written consent of Core States F `bK + , sse t° i.,�
<br /> L/? � U' FLANGES FOR INSTALLATION. D � �d'a�� � � x �
<br /> rr� � BRAVO--F--33--LS---D 3" BULKHEAD FITTING WITH TEST ! ORT Engineering is done at the user's
<br /> c>cS v.� on 01
<br /> 02_ ,_. F..._ FOR LCX PIPE AND DOUBLE WALL SUMP own risk, If used In a wa other 17ao Industrial drive,Suite r3
<br /> DrP5.2 ` �`�LJ a HC9T CONTRACTOR IS TO ENSURE -_- _.___....._._._-..._ �___._�_._. _ ___ �__...__ -.�____. -khan that specifically intended, user Layers,AR 72756 � ��
<br /> 5'H�N
<br /> r Q PRE-BUILT BIO--DIESEL MOTOR LINE SUMP PARTS LIST 2 TO 1 INPUT KIT VEEDER ROOT will hold Core States Engineering Phone(479)986-44aa
<br /> THAI TANGS ON EACH FLANGE IS _::----... .. �. -- :._ - __ __�-_.__ _.._, __�— __ -�_.. _ � g
<br /> ITEM QTY DESCRIPTION h I f II I d losses,
<br /> FA ( 7 ) 86 44x1
<br /> I i�F- - ALIGNED WITH EACH OTHER OF ON �_-.... 44_ -. _ _ - ..- _.-__ _,_- ._---- 33a02a-536 harmless from a Calms aCl
<br /> __ _..... _._._ _�.._.....-._e_ _ -
<br /> _ w
<br /> C2�.....
<br /> INSTALLATION. 01 V 2 MOTOR,_ 5HP, 3 PHASE, 208/240, EXPLOSION PROOF, EXTENDED DUTY
<br /> 03� _C)2 2 PUMP, GORMAN RUPP MODEL. GHS2JP3-6 - _ �._. _- (� 33" LCX COAXIAL, FIBERGLASS PRODUCT PIPE.
<br /> PRE-ASSEMBLED-- MOTOR PUMP ASSEMBLY WITH -- --RAWER._ MOR
<br /> 08 �� _-� 03 2 STRAINER, MaRRISaN 3" MODEL. 286 3 BELL & MALE N.E .F. ADAPTER 2" STRAINER, AIR RELIEF VALVE:, CHECK VALVE, -- - _ —___ __. ( )
<br /> 04 2 STRAINER, MORRISON 2" MODEL 286
<br /> _ 04 a lY
<br /> �.� z� CALIBRATION TEST PORT, AND BALL VALVES -. -- .--------- - - E- TEE
<br /> �
<br /> 1 05 2 METER, TCS 3" MODEL 700--35SPA 2DXW/TCS PUL.SER _ _ 05 3'° BLACK ST kL_ F f--
<br /> /_.... r - 06 2 METER, MCNAUGHT MODEL M50ARP-2E W/PULSER
<br /> 0'T 2 CEI[::CK VALVE, 2_" MORRISON MODEL 246 ADI _._ - 5 BLACK TEFL 9a ELBOW_. ... _ _ ..._.___-. .......� _. _� _�......._ __ BLACK STEEL__ _ W 0 z
<br /> ems__---------- -- -
<br /> �...________._____._. ._.___.__._-----_______.___.___. �_.m__ __.__ ___________...__.. ___ .__ __ _ 0 6 " (TYP)
<br /> 14 Le
<br /> _ _ ata 4 BALL VALVE, ?_" STAINLESS STEEL FULL PORT
<br /> -p - __._-� _. I T- __._ - 0 2" LCX COAXIAL. FIBERGLASS BIO-DIESEL l...INE (TY cn �
<br /> _._ 09 2 PRCSS[,JRE GAUGE, 0 100 PS _ C�I a � a. UMP PRE--ASSEMBLED BY FD BIO.-DIESEL INJECTION/ F' PASS
<br /> - SUMP PROVIDED BY OWNER. FOR COMPONENTS OF ASSEMBLY LY
<br /> -�>G I ? I U E _ P N 0 R a� r� BIO -DIESEL MOTOR LINE SUMP)PARTS LIST.NALL 01T-LER PARTS
<br /> _ _. _._ -... - - - - BRAVO F-22-L.S -D 2'° BULKHEAD FITTING WITH TEST PORT o a�: DIESEL MOTOR LINE SUMP
<br /> r�
<br /> 0 11 1 BRAVO B--834xD-AB, 12" LONG X 30" WIDE X 42' DEEP WITFI 08 r�
<br /> ca AND PIECES FOR INSTAL[ATION OF BIO-
<br /> PROVIDED BY CONTRACTOR: F3ELl_ BY MALES,
<br /> - FLANGE DOUBLE WALL. FIBERGLASS BIO DIESEL_ SUMP F R CX IP AN D UB E LL SU P a 0 Q LE;>, UNIONS, LCX
<br /> _ ___ _ _
<br /> [ � O BE PRa
<br /> iT. PIPE,
<br /> 04 K51j -- _ _ � �...___-__.._._ ._ —__-- 09 VEEDER ROOT 3300-0 -
<br /> 20 -486 SECONDARY CONTAINMENT VACUUM ETC.
<br /> {1� 13 2 BIO--DIESEL COMPUTER _ 0 SENSING SYSTEM KIT WHICH CONTAINS (4) 857280-1 as
<br /> TM _. 14 2 1500 WATT WALL HEATER BY GRAINGER, ORDERED/ SUPPLIED BY OWNER SENSORS Na TANK) AND 33175--001 ASSEMBLY FITTINGS .SUPPLIED AND INSTALLED LJ BYACONTRACTOR.
<br /> ENC,UI AN
<br /> Nie ALL ELECTRICAL AND CO
<br /> (
<br /> 05 I-�
<br /> 2 10 3.. BLACK STEEL_ UNION
<br /> - ,
<br /> _. r-05
<br /> 01_1 2" BELL & MALE N.P.T. ADAPTER
<br /> 1
<br /> T F`J1 _ PRE -ASSEMBLED MOTOR PUMP ASSEMBLY WITH 12 RIGID CONDUIT (NO EXCEPTIONS) W/SELOFF FITTING - REFER
<br /> - I 2" STRAINER, AIR RELIEF VALVE, CHECK VALVE, TO ELECTRICAL FOR CONNECTION (TYP)
<br /> 17 lu ltttll t ttl ttlttt I \ CALIBRATION FEST PORT, AND BALL VALVES
<br /> 1 1- -� -
<br /> II ttttttt tttttttttl
<br /> _rvy BEYOND
<br /> '
<br /> - BRAVO- F-10-RR-D 1" CONDUIT ELECTRICAL BLJI_KHFAD
<br /> FRONT OF HOUSING 13 FFITING, CONDUIT TO J BOX W/SEALaFF FITTING (SEE
<br /> (�
<br /> 06 t ELECTRICAL SITE PLAN FOR CONTINUATION)
<br /> VAC SENSOR 1 -
<br /> e = a `-`- w �~ -BARBED TEE (STP SIPHON PORT) 14 -
<br /> 15 08j __ - NON SUMP SENSOR IS TO BE PROGRAMMED
<br /> _ tltttt ttttttlttltl C� - �
<br /> 1 I -- - 1-
<br /> __... FaR POSITIVE SHUT DOWN VEEDER-ROOT 794380-208 as
<br /> 18 TTL T 15 L CABLE CONNECTOR--\ -
<br /> 20 ( _S FORT) 3" BALL VALVE MUST HOLD PRESSURE FOR TANKS TO BE ((
<br /> -- TI ' ) -' TAPERED BUSHING/NUT 15 1 �r � I �� l
<br /> ._, 9 INDIVIDUALLY TESTED
<br /> E tTTt TTttTTtt - 10 (02 CAt:31_E PAIR TO BARBED ELBOW (VAC TEST PORT)
<br /> t
<br /> FLOW FROM _ _C _ _ ILk
<br /> ASI �v"
<br /> BIT--DIESEL TANK _ "" I I ttitlitltttttttittt O JUNCTION BO VENT PORT
<br /> w,. . TT, _, STEEL BALL VALVE MUST HOLD PRESSURE FOR
<br /> Q8--__ - _- __- -- n - --3-WAY BALL VALVE TANKS TO F BE INDIVIDUALLY TESTED.LJTT
<br /> n. �� 3{ P
<br /> --VALVE HANDLE SHOWN IN OPERATING VACUUM ZONE 4
<br /> C - I RIP X11_ �?� . _..._ POSITION (DOWN) TO VENT MONITORED - 7" E3LACK STEEL FLANGES 4 E3aLTS WIT{{ 3 NPT AND VITaN VAGIJUM 7_ONE. 3-- ', _ {{ ii%iiiii
<br /> ' f 11 ( - ttttttttl �
<br /> ttttl
<br /> 1tt
<br /> U0,5 _ �. {0] � BARBED ELBOW
<br /> INTERSTICE ROTATE HANDLE UP C) GASKET. SUPPLIED BY OWNER. INSTALLATION BY CONTRACTOR. VACUUM TONE ?_ a =�
<br /> .'. _ _ - 01 VACUUM ZONE 1-
<br /> 21
<br /> m. 4
<br /> 15 -� '.� � TAPERED _ -
<br /> �.� � 21 �6� 1
<br /> BI NUT _-TUBING CONNECTS TO INTERSTITIAL. 6" BLACK STEEL_ FLANGES (4) BOLTS) WITH 2" NPT AND VITON - I �- -� T(r� LL
<br /> SPACE BEING MONITORED 1 GASKET, SUPPLIED BY OWNER. BOLTS AND INSTALLATION BY T ITTT
<br /> �_ 06 - 8 CONTRACTOR. F OWD FROM
<br /> TANK ttltttttttttttttttt T �
<br /> 1
<br /> 2 (p� VAC FLOAT - _ --.-
<br /> � -- 19 2" BLACK STEEL 90" ELBOW TYP ,�- -_.__ , _ q _.
<br /> 04- 1 1
<br /> ___ _.._�.__ ..._. (._�
<br /> ;0,
<br /> � --PIECE PRODUCT ID TAG TO BE INSTALLED ON PRODUCT LINE _ IL ' v I1 - ttiTiTtTTltlTlT
<br /> -
<br /> Pa.
<br /> BARBED (EE I II ittttlttttttttttttt
<br /> - TUBINGO(TYP) FIRE f - - .
<br /> BARBED ELBOW 21 FLEXING - FFUL3aX18MXU 3 X 18 MALE X UNION - � ��?._
<br /> ORIENT THE BARBED -- ,_ RATED FLEXIBLE HOSE U-P
<br /> _
<br /> .. _._(__ U TEF 0 N 'THIS END SO �.._ _.,_..._
<br /> ° "`i __.-_ ONE OF THE ENDS IS FLEXING - FFUL.20Xl8MXM 2" X 18" MALE X MALE FIRE f
<br /> FACING FRONT RATED FLEXIBLE HOSE 4,
<br /> 23 2 LCX COAXIAL FIBERGLASS CHASE PIPING _ - ���
<br /> / ��,:�:: -" VACUUM MONITORING ZONES �_) 2 _ ,
<br /> \0 / '"m
<br /> 1 BIO PRODUCT SUCTION LINE {�1 FROM TANK TO SHED
<br /> � � � BALL VALVE AT EACH PRODUCT LINE TO PIPING ANNULAR `' - e (� QC�
<br /> .z 4 SPACE TYPICAL._
<br /> 2 BIO PRODUCT SUCTION LINE2 FROM TANK TO SNED
<br /> r - �� 1 ►`°
<br /> CY '� `c 3 DIESEL FEED PRODUCT LINES TO SHED1-0
<br /> 5 VEEDER ROOT 576008-657 BARBED TEE
<br /> �y. LU >� - O `v" 4 BIO -DIESEL RETURN I..INES FROM SHED TO MAIN TRUNK LINES `ar"m o✓" T _ -_.-. ._.-__
<br /> _i �6} VEEDER ROOT 332310-003 VACUUM HOSE
<br /> V)c�� �c7 ra i� AND VACUUM CHASE LINE FT�OM DIESEL ��FANK STP _ .. ._.___.�_.__-______..=.__._ ._ - � _ � __..
<br /> rJ i_, n n � �� � TYPE 40 BC FIRE EXTINGUISHER TO BE INSTALLED AT TANK
<br /> "
<br /> VACUUM SENSING SYSMM
<br /> -_ _. __ ..__r. _._____ ____ f_._.___ 0 �Y�
<br /> _ STORAGE AREA PER LOCAL JURISDICTION _° w`l
<br /> PP N.T. L
<br /> _ �''
<br /> �.�
<br /> r
<br /> �. C�
<br /> _...._..__.._.�__. C� t Q LG.! C7 2
<br /> UJ �.__
<br /> L,Gl I..a._YJ U._5 L.. �
<br /> M CL
<br /> 0.3 (BEYOND) LO
<br /> N-
<br /> LL_
<br /> ��
<br /> �10
<br /> _-[06
<br /> (BEYOND)
<br /> (BEYOND) [c)9]-- (BEYOND) [0�-
<br /> 17 (BEYOND)
<br /> I�5
<br /> 191 (BEYOND) a)
<br /> C} _ —_ -- __ _. _ __ _—.__ZL___ ___._.____ _.____------.__._. ____ _ZZ___ 0 00
<br /> _—__._ _ ___..___. _
<br /> a6 - _._._.__ _.. -
<br /> .___ ____._.
<br /> T
<br /> 0 S - I ._._-_------
<br /> (BEYOND)
<br /> _
<br /> (BEYOND)
<br /> tttttttttttttttlttl 1 5
<br /> m .YM _ _.___ a9 17 HEATER TFIERMOSTAT (ON UNIT)
<br /> S1F' VACUUM LINE— _ C6 1 ,.... V T
<br /> c
<br /> - 0
<br /> - 1
<br /> _
<br /> C__}
<br /> VACUUM ZONE. 2-- ?_2_
<br /> 7_aNE 3-- (BEIaND) I �� '\'�
<br /> VACUUM _ a 16 ` Q:� _ °� ( �2 02 __. 1. (BEYOND) J
<br /> VACUUM ZONE 1------ �-. --____ 16
<br /> �.9 �� II — — „
<br /> 07 BEYONDFLUORESCENT
<br /> (19
<br /> 04. 1 1
<br /> Q5 - I (BEYOND) FIXTURE
<br /> 26 I. d 1 3 .,, . d J1� ... - - 18 _ANCHOR STRAP
<br /> -a - --- _. (2 PLACES)
<br /> Y r
<br /> C
<br /> 05 01 I 1
<br /> q
<br /> I
<br /> 00
<br /> 15
<br /> 0
<br /> 7777777
<br /> 1 3, 05 _ Ln
<br /> �o
<br /> n a
<br /> N
<br /> EXHAUST FAN _----- 0
<br /> - CHASE FROM __ -.. - 05 i J -_ - --
<br /> - 3 DIESE:.L. TANK STP 0 I � C)
<br /> �L) a -
<br /> / / FRO
<br /> @ v
<br /> � � 11 fr 4�r SECTIO SEE SHEETS PF 5 3 FOR pa I
<br /> T rt- _FLOW FROM
<br /> FLOW FROM - -
<br /> _ - BIO--DIESEL- TANK C>
<br /> -- CONCRETE SPECIFICATIONS. „_ � _ �
<br /> BIO DIESEL TANK -- NOTE:.: a CONCRETE SUPPLIED AND 5 -- 0
<br /> Y ,
<br /> -- -----FAN FHERMOSTA[
<br /> SEE OVERALL l_AYOIJT FOR DIRECTION PIPE INSTALLED BY CONTRACTOR _ _
<br /> < _ � K ,: x FLOW FROM
<br /> 4 ..W EXITS SUMPS AND EXTENSIONS -
<br /> u DIESEL TANKS
<br /> ----SWITCH
<br /> N
<br /> (BEYOND) �i�-- ' � ��` I TRUCK D I S P ',
<br /> a6i —)
<br /> .. ..
<br /> - - ---
<br /> - �� _.. 15 a6- 10 04 _ 11 �� 2q a1 03 _.__ ___..___._ ____---- _______ , �_�__...__ ____.__ ._ __. _._.____ a
<br /> C0`�..-. 0 03 01 C14) (20) 04
<br /> *PIPE INLET ELEVATION AND OUTLET ELEVATION ON THIS DRAWING ARE FOR REFERENCE ONLY. ACTUAL_ PIPE
<br /> BURIAL DEPTHS MAY VARY AND ARE TO BE VERIFIED IN THE FIELD. CONTRACTOR IS TO VERIFY TANK DEPTHS SIDE SECTIO
<br /> WIRING JUNCTION BOX ----
<br /> AND
<br /> C)X---
<br /> AND COORDINATE INSTALLATION OF PRODUCT PIPING WITH PILOT CONSTRUCTION MANAGER. MAXIMUM BURIAL_ --SWING DOOR
<br /> FOR THIS SUMP IS 42". GENERAL CONTRACTOR IS TO CHECK FOR PIPE CONFI-ICTS WITH STORM PIPES. ALL
<br /> BIO-_DIESEL AND DIESEL PRODUCT LINES ARE TO SLOPE 1/8" PER FOOT (1%) MINIMUM BACK TO THIS SUMP RECEPTACLE OR THE DIESEL- TANK SUMPS.
<br /> 1 _� _d
<br />
|