My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
35
>
2300 - Underground Storage Tank Program
>
PR0516243
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 8:21:27 AM
Creation date
11/5/2018 3:19:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0516243
PE
2381
FACILITY_ID
FA0012529
FACILITY_NAME
STORAGE YARD - JOE OMACHI
STREET_NUMBER
35
STREET_NAME
JACKSON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
147-19-010
CURRENT_STATUS
02
SITE_LOCATION
35 JACKSON ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACKSON\35\PR0516243\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.., <br /> 8. Describe Ute method that will he ud]Ued to PUM andtor Inert the Mk(s): <br /> Dry ice will be added to the tank(s) at the ra <br /> er ga ons capacity for die and <br /> —per gallons capacity for gasoline tanks. <br /> b. Taak,Tioin;Hauler. <br /> Name Jim Thorpe Oil , Inc. <br /> Address P.O. Box 357 city in(li r-p -9357 <br /> Phone 304 209 ) 368-6175 _ <br /> HaWerRegletmilus#(ithauled ash=rdmie) 2667 <br /> a TanWIDiping Disposal Site: <br /> Name Schnitzer Steel Products <br /> Adtirm 12000 Folsom Blvd. MryRancho Cor. aAa� 1x742 <br /> RNme <br /> 916 985-4810 <br /> gpA filo(U transported 10 a permitted TSO facDiry) <br /> 9. 1s%he aampnag arm an independent third party from the contractor? YES(T, NO I I <br /> 9a. Describe,In detail,how the tail and orwater sample(s)beneath the tank and piping will be obtained: <br /> Sam les will be taken from native soil at least 2 to 3 feet <br /> under til former anK location with the hackhn_P• SamnlPs will taken <br /> from i k fine hnrl.P Water camniPc wi 11 , if needed_._ will be <br /> taken with a bailer. <br /> 10. Describe how the e=vsdu will be bacMled with suitable material upon removal• <br /> Backfill of the excavation(s) will done at the aDUropriate time <br /> during this proiect Backfill material will consist of the <br /> excavated material and other suitable clean compactable material. <br /> 11. Handling of excavated soil, <br /> a)n.at material wHl be used to line the talk pit and corer the stackpl1e7 <br /> 6 mil plastic sheeting. <br /> b)that will be the coal destination of the excavated stoekpDe? <br /> Depending upon the contaminate, levels of said contamination <br /> an quantities o soil , the sot will e treatedon site or hauled <br /> c)Contammatedsoil Hazardous RaateHealer. to a suitable landfill. <br /> Name Jim Thorpe Oil , Inc. Hauler lieglcsanon# 2667 <br /> Adm,ess P.O. Box 357 _City Lodi , CA gip 95241-0357 <br /> Phone No.[_2O9 368-6175 <br /> EH 2$046(Revised 09113+90) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.