Laserfiche WebLink
e <br /> gpuer,es <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD 3 a <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> rti <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE CF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENCED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED; fi s`,r's '�' - ,��`=� ' `' `, �' ,✓ P' <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.0 B. MANUFACTURED BY: <br /> C. {LATE INSTALLED(MO/DAY[YEAR) i� it '>, D. TANK CAPACITY IN GALLONS: <br /> 11.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. v <br /> A. '+��.° 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C ❑❑ 1a REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> 2 PETROLEUM ❑ 8d EMPTY 1 PRODUCT F�llc <br /> b PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> MIDGAADE UNLEADED ❑ 5 JET FUEL ❑ B M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.EELON!) <br /> D. IF(A,i)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> ' 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER E7 _1 5 INTERNAL BLADDER SYSTEM L 95 UNKNOWN <br /> A. TYPE OF ❑ <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK F71 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑, 8 106% METHANOL COMPATIBLE WIFHP <br /> {Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAPA 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> SPILL CONTAINMENT INSTALLED(YEAR) OVERFIL)r PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> E.SPILL AND OVERFILL,et(:- DROP TUBE YES NO STRIKER PLATE YES ')( NO DISPENSER CONTAINMENT YES r4. NO <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A j( ' DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U~2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)Aetf�FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 5 CONCRETE A U 7 STEEL WICOATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 0 1 MECHANICAL LIN€LEAK 2 LINE TIGHTNESS $'CCNTINLOUS INTERSTITIAL 4 ELECTRONIC LINE SAUTCMATIC PUMP [�":'"]� 99 OTHER <br /> DETECTOR ❑ TESTING ❑'Y,MONITORING ❑ LEAK DETECTOR �.. SHUTDOWN LJ <br /> V.TANK LEAK DETECTION <br /> ANNUAL <br /> 1 VISUAL CHECK E:32 pECONCILNUAL I�ATEONVNT�RY ❑ 3 MONCITORING —"w:VAOZE4 GAUGINGAUTOMATIG TANK ❑ 5 MONTORINGGROUND WATEH ❑ 6 TESTINGTANK <br /> + 7 CONTINUOMONITORING INTERSTITIAL E] 8 SIR ❑ 9 WEEK LY MANUAL E-] 10 MMONTHLY <br /> TANK ❑ 95 UNKNOWN El 99 OTHER <br /> G TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MOIDAYNR) 2.ESTIMATED QUANTITY OF 3,WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED b SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# *j'- <br /> STATE k.D:# ❑ C.' � / <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLIC ION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THreRGROUND STORAGE TANK REGULATIONS <br /> FOAM 8 (6.95) <br />