My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1111
>
2300 - Underground Storage Tank Program
>
PR0506724
>
COMPLIANCE INFO 1998 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2021 3:47:38 PM
Creation date
11/5/2018 3:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2007
RECORD_ID
PR0506724
PE
2361
FACILITY_ID
FA0007594
FACILITY_NAME
WINE COUNTRY STATION/7-ELEVEN
STREET_NUMBER
1111
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04931056
CURRENT_STATUS
01
SITE_LOCATION
1111 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\1111\PR0506724\COMPLIANCE INFO 1998 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2007
QuestysRecordDate
7/11/2018 4:26:40 PM
QuestysRecordID
3925819
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P Site Address: <br /> orresting <br /> F. In-Tarok Gauging/ SIR Equipment: CrClieck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-lank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ENo <br /> * Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ * Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ * Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes I ❑ No* i Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and When these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist:Ef f <br /> Yes ❑ No* For equipment start-up or annual equipment c i ication, was a leak simulated to verify LLD performance? <br /> El N/A (Check all that apply) Simulated leak rate: C1`3 g,p.h.; 130.1 g.p.h , ❑ 0.2 g.p.h. <br /> Cf Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y El No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ NO For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 2i--'N—/A or disconnected? <br /> r(U <br /> Yes ❑ Talo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test?Yes ❑l No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> U N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below,describe how and when these deficiencies Were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 D5�11(1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.