My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1111
>
2300 - Underground Storage Tank Program
>
PR0506724
>
COMPLIANCE INFO 1998 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2021 3:47:38 PM
Creation date
11/5/2018 3:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2007
RECORD_ID
PR0506724
PE
2361
FACILITY_ID
FA0007594
FACILITY_NAME
WINE COUNTRY STATION/7-ELEVEN
STREET_NUMBER
1111
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04931056
CURRENT_STATUS
01
SITE_LOCATION
1111 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\1111\PR0506724\COMPLIANCE INFO 1998 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2007
QuestysRecordDate
7/11/2018 4:26:40 PM
QuestysRecordID
3925819
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAIN JOAQW COUNTY ENVIRONMENTAL HEALTIWPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (One farm per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION ROI. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> FACILITY NAME R0' <br /> FACILITY SITE ADDRESS R03. Cly R°a. <br /> M L1S l <br /> II, SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> 9 Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> D Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> 4 We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waSte Stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete ly if applicable) <br /> EQUIPMENT <br /> LOCATION AVAILABILrrY <br /> RIO. R20ve6o 4-- 04 - 1 tj MAI WnNtxfiIL% <br /> do1s-r ef., RI 1. A � CAM_ M).r0 R21. <br /> t � tt30. <br /> R22. 'Y t O R32, <br /> R 3. R23. � R33.. <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE ,war RSo. <br /> R41. R51. <br /> NAME T LE <br /> NAME R42. TITLE R52. <br /> NAME R43 TITLE Rs3 <br /> V.'INDIRECT HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE M THE SECONDARY <br /> CONTAINMENT IF MONITO Gy�INDICATES <br /> �APOSSIBLE UNAUTHORIZED RELEASE: } <br /> U��/ P��'�S t..t '✓j ��(+�� � ts'�`�`f �}V 1 n�/1.�{ I/� �� • _ 1 '��1✓ (�I� R50, <br /> RAVE p Fes-' 0'F 110':T <br /> �! <br /> SJCEHD-e(06103)-1/3 06/25/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.