Laserfiche WebLink
SWRCB, January 2002 Page H of <br />b. PIPING SUMP TESTING <br />Test Method Developed By: <br />U Sump Manufacturer <br />U Industry Standard 1� gin <br />rofessional Eneer <br />U Other (Specify) <br />`� <br />Test Method Used- <br />U Pressure <br />U Vacuum <br />`Hydrostatic <br />U Other (Specify) <br />'Fest Equipment Usa. <br />Lew ,& e5- . 4) ew- <br />Equipment ResolutiGm) ,f x-412 = i y '� , �, � ✓ <br />Turbine shutdown response time <br />Sump# L <br />Sump # -L <br />Snmp # sump # <br />eter. <br />7Matcriah <br />42°'1 <br />-L`PLi-1►1 <br />es U No U NA <br />h. <br />�,,4! <br />p <br />{ i" lee 45 <br />YesU No U NA <br />Yes U No U NA <br />Height from Tank Topto Top of <br />` <br />Was failsafe verified to be <br />7� <br />Yes U I�Io U NA <br />Hi st in Penetration: <br />1es U No . U NA <br />U Yes U <br />o U NA <br />Height from Tank Top to Lowest <br />11 <br />f <br />t i l i <br />i1 <br />EIectrieai Penetration: <br />Wait time between ing <br />1 l <br />Condition of sump prior to testing: <br />y <br />y <br />Pnrtinn of Rumn TactP.]' <br />Lr. L, I t 9 J I I_a . L __ IP <br />i e_ n 1 J1 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />U Na U NA <br />es U No U NA <br />U No U NA <br />_product and water)?; <br />res <br />Turbine shutdown response time <br />S e. c , <br />,r c_- <br />7 rc . <br />*Ljo <br />Is system programmed for fatit-safe <br />es U No U NA <br />shutdown?:* <br />YesU No U NA <br />Yes U No U NA <br />U <br />Was failsafe verified to be <br />7� <br />Yes U I�Io U NA <br />� U No U NA ' <br />1es U No . U NA <br />U Yes U <br />o U NA <br />0 <br />Wait time between ing <br />pressurefvacuuml ater Ad starting <br />test: <br />l OW1 n" <br />5 <br />b wt <br />Test Start Time: <br />r"1 /S <br />i U ' I <br />I l ' 1,5— <br />,5—Initial <br />Initial Reading (R�: <br />t Gr 'Gf2. 1 • �,� Gr, �.to <br />r s ar s rc L <br />Test End Time: <br />, L(5 I <br />Final Reading (RF): <br />l=rv5 f -Irrer S { GircCE <br />pvS�CnY <br />Test Duration <br />�O ml iwc f <br />3d <br />Change in Reading (RF -P4).- <br />Y� 0 L6 -,L, <br />N 0 [A,� -< <br />Pass/Fait Threshold or Criteria:( <br />(I+tir 7 v <br />�, <br />hT <br />Was sensor removed for testing? res "o o u 1vA ea U No U NA 'Yes U No U NA U Yes j No U NA <br />Was sensor property replaced and <br />verified functional ager l Yes U No 1J NA 1 es U No U NA Yes U No U NA U Yes U No U NA <br />testas 7 <br />Comments — Cb lude ltrforntation on repairs made prlvr� to testing mn"recom»sendedfo1'lou tup for failed tests <br />If the entire depth of rhe sump is not tested, specify Trow much was tested. If the answer to any of the questions indicated with an <br />asterisk (•) is "NO" or "NA". the entire sump must tee tested. (See SWRCS LO -160) <br />