My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2449
>
2300 - Underground Storage Tank Program
>
PR0503357
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 3:19:00 PM
Creation date
11/5/2018 3:36:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0503357
PE
2381
FACILITY_ID
FA0003760
FACILITY_NAME
SUNWEST LIQUORS
STREET_NUMBER
2449
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
02741005
CURRENT_STATUS
02
SITE_LOCATION
2449 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\2449\PR0503357\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Protect Location <br /> 2449 W. Kettleman Lane, Lodi, CA 95242 <br /> Owner Jams Anagnos Phone No. (209)333-1036 <br /> Contractor JIM THORPE OIL. INC. Phone No. (209)368-6175 License No.495699 <br /> INDICATE ME'I'11OD OF BACKFILL QUALITY ASSURANCE <br /> _ L Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verificatlon, e.g., load ticket, within 30 days of project completion that one of the following materials <br /> was placed In the excavation in 12" lits: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (314) Inch In cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soll Engineer's Compaction Report will be submitted within 30 days of rojecl completion,or submission <br /> of verification that the select material described above will be placed at a minimum of five (5�cubic yards per 10011 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> • JIM THORPE OILnINC. <br /> ame r nt <br /> • CON'rRACT0 <br /> �'em' <br /> • Signature <br /> ' Shall be the responsible managing employee on the license or authorized agent. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.