My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
330
>
2300 - Underground Storage Tank Program
>
PR0232267
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 2:47:48 PM
Creation date
11/5/2018 3:38:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0232267
PE
2381
FACILITY_ID
FA0003768
FACILITY_NAME
TAYLOR TOURS
STREET_NUMBER
330
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06206052
CURRENT_STATUS
02
SITE_LOCATION
330 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\330\PR0232267\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1We Nue <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location <br />Phone No. <br />Owner <br />Contractor JIM THORPE OIL INC. Phone No. (209)368-6175 License No.495699 <br />INDICATE ME1110D OF BACKFILL QUALITY ASSURANCE <br />_ L Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission or verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br />was placed in the excavation in 12" lifts: <br />A Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />_ B. Crushed rock--self-compacting material not more than three-quarters (3/4) Inch In cross sectional <br />tmesurement. Use Of hea <br />abackfill mate al and talnkstpipesed rock wmade of polyill not be rresio glass or sfor imilar mll if contact will be ade between <br />milar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of p) roject completion, or submission <br />displacem entnand that the entct ire excavatioerial n will beabove <br />b backfilled and compacted laced at 2 imum Of fiveto insure compliancecubicwith thper <br />e UniformBuilding <br />Code Appendix Chapter 70. <br />• JIM THORPE OILrINC. <br />ame rmt <br />• CUN'1'R " <br />it r nt <br />tgnature <br />Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.