Laserfiche WebLink
SWRCB,January2002 • • <br />Page 7 of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: � Piping Manufacturer D Industry Standard D Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: __ jWPressure _ __-Ej Vacuum D Hydrostatic <br />D Other (Specib) <br />Test Equipment Used: i s r <br />Equipment Resolution: <br />iris <br />Pimg Run # { <br />Piping Run # L_ <br />Piping Run # xj <br />Piping Run # <br />Piping Material: <br />C 12: v15 <br />/a,�t til; <br />Piping Manufacturer: <br />i !T <br />, : l 1, <br />'. r, 4 t �•r <br />Piping Diameter: <br />3 tt <br />Length of Piping Run: <br />JruaX• /1 r) <br />y. l 21J l <br />/ l <br />tJX l �S" I <br />Product Stored:_- <br />Methodandlocation of <br />piping -nm isolation: <br />:,r <br />Wait time between applying <br />pressure acuum/water and <br />startm test: <br />; t <br />Test Start Time: <br />Initial Reading (R): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rr) <br />Pass/Fail Threshold or <br />Criteria. <br />0 1 uJs'r- <br />, % s r <br />vo /-oss z, rls r- <br />co 15 r lrs-t <br />Test Result: <br />0 Pass D Fail <br />0" Pass D Fail <br />Y Pass ' D Fail <br />0 PassD Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />