My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO 2001-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 1:08:13 PM
Creation date
11/5/2018 3:42:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2010
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\420\PR0231906\COMPLIANCE INFO 2001-2010.PDF
QuestysFileName
COMPLIANCE INFO 2001-2010
QuestysRecordDate
5/19/2017 11:33:18 PM
QuestysRecordID
3391364
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January2002 • • <br />Page 7 of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: � Piping Manufacturer D Industry Standard D Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: __ jWPressure _ __-Ej Vacuum D Hydrostatic <br />D Other (Specib) <br />Test Equipment Used: i s r <br />Equipment Resolution: <br />iris <br />Pimg Run # { <br />Piping Run # L_ <br />Piping Run # xj <br />Piping Run # <br />Piping Material: <br />C 12: v15 <br />/a,�t til; <br />Piping Manufacturer: <br />i !T <br />, : l 1, <br />'. r, 4 t �•r <br />Piping Diameter: <br />3 tt <br />Length of Piping Run: <br />JruaX• /1 r) <br />y. l 21J l <br />/ l <br />tJX l �S" I <br />Product Stored:_- <br />Methodandlocation of <br />piping -nm isolation: <br />:,r <br />Wait time between applying <br />pressure acuum/water and <br />startm test: <br />; t <br />Test Start Time: <br />Initial Reading (R): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rr) <br />Pass/Fail Threshold or <br />Criteria. <br />0 1 uJs'r- <br />, % s r <br />vo /-oss z, rls r- <br />co 15 r lrs-t <br />Test Result: <br />0 Pass D Fail <br />0" Pass D Fail <br />Y Pass ' D Fail <br />0 PassD Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.