Laserfiche WebLink
Feb 0510 03:07p AFFORDA TEST 2094-0116 <br />• p.4 <br />F. In -Tank G uging ) SIR Equipment: ® Check this box if tanx gauging is used only for Inventory conlrei. <br />❑ Check this Sox if no tank gauging or SIR equ pment is irslallec. <br />This section mu t be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the f (lowing checklist: <br />❑ <br />Yes <br />] <br />No' <br />Has all nput wiring been inspected for proper entry and termination, including testing for ground fauls? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all lark gauging probes visually inspected for damage and residue bgildup? <br />❑ <br />Yes <br />❑ <br />Not <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />E <br />No' <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />NW <br />Were at items on the equipment manufacturer's maintenance checklist completed? <br />Section H, below, de ribs how and when (hese deficiencies were or will be corrected. <br />e Leak Detectors (LL ❑ Cneck this box it LLDS are not installed. <br />I <br />lurr race my <br />rvnuwrn <br />_ <br />For equipment startup or annual equipment certification, was a leak simula:ed to verify LLD performance? (Check as that apply) <br />Simulated leak rate: ® 3 g.p h.; ❑ OJ g.p.h : ❑ 0.2 g.p.h, <br />® Yes❑ <br />No' <br />NIA <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />' ! <br />Was the testing apparatus properly calibrated? <br />' <br />A' <br />For mechanical LLDs, does the LLD resldct product flow if it detects a leak? <br />IAo' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />ff' <br />For alectronic LLDs, does the turbine automatcally shut oi'if any portion of the monitoring system s disabled or disconnected?/Ao' <br />Ao' <br />For eledronio LDs. does the turbine automatically shut off If any portion of the rron•tor ng system malruncuors or tails a test? <br />!Ao' <br />For electronic LLDs, have all accessible Wring connections been visualy inspected? <br />Were all items on the equipment manuracfurers maintenance checklist completed? <br />n Section H, below, d s<Hbe how and when these deficiencies were or will be corrected. <br />H. comments: <br />