„
<br /> J
<br /> t 1 2 3 . a ',` 5 6 7 8 9 - 1 O - 11 12 13 14 15 16 17
<br /> ” • - -36" MULTIPORT MANHOLE WITN,>
<br /> a IN$T
<br /> LIQUID TIGHT FILL BOX 36' MULTI, PORT MANHOLE WITH J M'' MANHOLE '
<br /> ALLATION INSTRUCTIONS: ' LIQUID,-TIGHT FILL BOX JUNCTION 80%. (EXPLOSION PROOF) INStALL AN,,
<br /> PORT
<br /> 1, INSERT FISH TAPE THROUGH ANNULAR SPACE. - —SUMP SHIELD -
<br /> VAPOR RECOVERY ADAPTOR --- SEPL OFF OVER SUMP PROgE
<br /> 2. .ATTACH PULL-STRING TO SENSOR. - - AND CAP ALIGN OBSERVATION PORT IN
<br /> (• ' 3. TAG SIGNAL CABLE AND PULL-STRING EACH MANHOLE WITH UMP OF THE
<br /> COLOR CODED PRODUCT COLLAR CEI TLM PROBE MOUNTING FITTING CONTAINMENT SUMP COVER. 3/4" EXPLOSION
<br /> M 18 FEET FROM SENSOR. (TYPICAL FOR
<br /> B FOOT DIAMETER TANK.) ' SUMP SHIELD PROOF 45' ELBOW s
<br /> f 4. ATTACH FISH TAPE TO POLI-STRING. *' 4" TOP SEAL ADAPTOR AND!CAP. 4" CAP ON RISER COMPRESSIBLE STYROFOAM SEAL OFF
<br /> I 5. PULL SENSOR THROUGH ANNULUS, JUNCTION BOX JUNCTION BOX (IS�LBSS THAN 2" FROM
<br /> 6. MATCH TAG MARK ON SIGNAL CABLE API COLORED REFLECTOR - ) PIPE CAP WITH HOLE
<br /> F AND PULL-STRING. PIPE CAP WITH HOLE FOR _
<br /> 7. SENSOR IS NOW POSITIONED AT - 18"' MANHOLE W/ �� 4" TO TOP 4"-T0 TOP CONTROL WIRES PFA GRAVEL FOR CONTROL WIRES t
<br /> BOTTOM CENTERLINE OF TANK. SECURED
<br /> f �r LIDOF ADAPTOR OF' ADAPTOR 4
<br /> 8, PULL-STRING IS TO REMAIN d
<br /> - 4
<br /> IN PLACE AND FUTURE WATER TGHT SEAL HOLD 'TRUE HOLD TRUE C ' c o
<br /> ° a 4 a
<br /> a • ® ••°
<br /> ACCESSIBLE. I •ANNR SPACE d o o
<br /> Q
<br /> • o
<br /> oL
<br /> RISE CAP ° i
<br /> . q
<br /> r - PEA GRAVEL COMPRESSIBLE STYROFOAM (IF LESS H
<br /> MONITOR TAG & PEA GRAVEL THAN 2' FROM SAB:) CONTAINMENT SUMP
<br /> a HOLDER 5 REDUCER
<br /> '° COMPRESSIBLE STYROFOAM CONTAINMENT SUMP I 3/4" CONDUIT FOR 'ELECTRONIC TANK
<br /> R •" +, - (IF LESS THAN 2" FROM SLAB) REDUCER --- I
<br /> f1, MINIMUM CLEARANCE - - GAUGE WITH SEAL OFF - REFER TO
<br /> SCH. 40 NIPPLE 4'-300# COUPLING 4"-300)) COUPLING ELECTRICAL SHEETS JUNCTION BOX
<br /> TURBINE PUMP (EXPLOSION PROOF)
<br /> (GALVANIZED) �-- CONTAINMENT SUMP 4 $CH.. 40 GALVANIZED RISER i 2" NIPPLE _ 1 SEAL OFF f
<br /> 4"-300 COUPLING REDUCER PRIMED AND \NRAPPED
<br /> —4"-30Q# COUPLING
<br /> 3/4 RMC FROM I PENETRATION BOOT 2FUlLLPORTLVF. — ei
<br /> V ( ) PENETRATION BOOT .j t
<br /> K _ _ CONTAINMENT SUMP ANNULAR SPACE MONITOR I (FOR CONDUIT) 2" CLOSE NIPPLE (FOR CONDUIT) :P
<br /> ' JUNCTION BOX I ,
<br /> 3/4" 0 RMC 4" ALUMINUM FILL TUBE I 3/4" RMC TO REMOTE PUMP J-8GX 2" TEE . i CEI CONTROL PANEL " I
<br /> s - TO FILL SUMP J-BOX 2" BELLxMALE F.R.P. p 3/4" RMC FROM
<br /> THREADED ADAPTOR pqq 4" SCH. 40 GALVANIZED STEEL RISER FILL SUMP J-BO% ,i I 3/4" RMC TO .1
<br /> 4" SCH. 40 GALVANIZED RISER ry I PRIMED & WRAPPED - ELEC, PANEL .l
<br /> c N PENETRATION BOOT — I
<br /> PRIMED AND'.WRAPPED PENETRATION BOOT I 2"x18" FLEX CONNECTOR (FOR CONDUIT) I (PUMP POWER) ,
<br /> a I MALE SWIVEL/FEMALE '+
<br /> _4" SCH. 40 GALVANIZED 2° P.R.FVENT LINE 3000 STEEL UNION LINE PRESSURE r r
<br /> TRANSDUCER
<br /> PIPE RISER - SLOPE 1/4" PER ,FT. \ I '
<br /> IF PRIMED & WRAPPED + TANK FITTING MINIMUM TOWARD TANK _ 2' BALL VALVE I
<br /> F.R.P. PHASE II VAPOR RETURN PIPE (FULL ,PORT) PENETRATION BOOT
<br /> „ - FIBERGLASS CONTAINMENT SUMP
<br /> !f —4" SCH. 40 GALVANIZED TO TANK COLLAR 70 INSURE
<br /> PIPE a WATER TIGHTNESS 2"x18" MxF FLEXIBLE
<br /> 00 PRIMED &RWRAPPED SEAL AT PLATE CONNECTION 2":X 18' FLEXIBLECONNECTOR I '
<br /> I N CONNECTOR— PENETRATION BOOT .r NOTE: 00 NOT EXCEED ^ )
<br /> 22" TANK MANWAY MALESWIVEL FEMALE MANUFACTURERS SPECIFIED 2" FRP PRODUCT
<br /> _ PIPE IN 3" FRP A
<br /> 0TANK EXTRACTOR FITTING BEND RADIUS. SECONDARY CONT..
<br /> Ea a FITTING THREADED AADAPTOR �' - PIPE
<br /> 0 - 22" TANK MANWAY '
<br /> PRIMEDE&TUBE WRAPPEDR
<br /> P
<br /> IPE OPEN AT n
<br /> BOTTOM. ATTACH TO- SUMP +
<br /> u
<br /> U) 3" 95% FLOAT VENT/VAPOR - AS NEEDED FOR SUPPORT.
<br /> 4 N.P.T. AS NEEDED. ATrACR SUPPORT
<br /> M SfOE VIEW A7 TANK BOTTOM VALVE. BOTTOM. ATTACH SU SUMP
<br /> L _ �\ API/ROMAN LS-3 PROBE 4" N.P.T,. API/ROMAN
<br /> ,. PLUGGED
<br /> PRODUCT FLOAT NST ,�.- LS-3 PROBE
<br /> a NOTES: NOTES: �
<br /> WATER FLOAT �-"� 3"x2" REDUCER WITH
<br /> z WIRE INSTALLATION CABLE 1, PERPENDICULAR PENETRATION OF CONTAINMENT 1. PERPENDICULAR PENETRATION OF CONTAINMENT 1. PERPENDICULAR PENETRATION OF CONTAINMENT y
<br /> $UMP PREFERRED. 20' MAXIMUM ALLOWABLE SUMP PREFERRED. 20' MAXIMUM ALLOWA�LE - SUMP PREFERRED. 20' MAXIMUM ALLOWABLE OPEN NPT PORT FOR
<br /> SENSOR PENETRATION ANGLE BOTTOM LOCKING NUT PEyETRATION ANGLE. SECONDARY CONT.
<br /> PENETRATION ANGLE. DRAINAGE
<br /> ® �NN ��� �0 �1i9� II"Y/tl®9 ��119R 2. USE PENETRATION BOOTS AT ALL SUMP 2. USE PENETRATION BOOTS AT ALL SUMP ' STEEL PLATE AT TANK BOTTOM 2. U59 PENETRATION BOOTS AT ALL SUMP
<br /> u ' Z PENETRATIONS. PENETRATIONS. �� PE 'ETRATIONS. 2" FRP BELL x MAZE -
<br /> SCALE: 1 THREADED ADAPTOR `-
<br /> Q 3. ALL JUNCTION ARE TO BE PLACED WITHIN 3. ALL JUNCTION BOXES ARE TO 8E PLACFo,WITHIN 3. AL JUNCTION BOXES ARE TO BE PLACED WITHIN
<br /> I' 0_ 1'-O" BELOW FINISHED GRADE, 1'-0" BELOW FINISHED GRADE. - 1'-Q BELOW FINISHED GRACE 3
<br /> 11 Lpl�TAI TLM PROBE, OR DETAIL 2 REMOTE PUMP DETAL
<br /> SCALE: SCALE. 1 0 S
<br /> i
<br /> F ° Y� Q CONTRACTOR SHALL VERIFY THAT THE
<br /> ` *SET TANK DEPTH TO ALLOW " 'I!
<br /> PRODUCT, VAPOR AND VENT o ` ' TURBINE HEAD WILL BE BETWEEN 4" TO 6
<br /> LINES ro SLOPE 1/4° PER �w Jo PEA GRAVEL ABOVE THE TANK BOTTOM. DO NOT
<br /> FOOT Mw. TOWARD TANK.
<br /> �` 0 2 BACKFILL FOR DETAIL OF TANK SLAB INSTALL TURBINE PUMP ASSEMBLY IF
<br /> — SHEET F-4 IT IS LESS THAN 4" FROM BOTTOM
<br /> — .' ,—.� _ •— —. = — OF TANK.
<br /> REMOVE SHIPPING PADS FROM
<br /> S'EAL'ENTRY Boor CONNECTION o Pump TANK PRIOR TO INSTALLATION
<br /> TO CONTAINMENT SUMP SERRATED • ,;ri. h TUBE'
<br /> FLANGED NUT (TOP.)
<br /> —'— FLE0LE ENTRY SCOT - - —� 01/28/98 CONDOCS '$
<br /> TOP z 1/21 TO STAI�t,ESS STEEL _ -
<br /> + CF _ TOP OF =FIRFSHED CLAMP �/' _. .._ _ ._ _ _ _ \ . .
<br /> ADAPTOR BUCKET _ GRADE �. STEEL PLATE.
<br /> � / —4" ALUMINUM FILL TUBE I I I \ ' rIA11
<br /> OVERLAP 7 ¢ 4"0 —MONITOR PROBE TO LOWEND OF' TANK, / N0. . MmSoNs/ ulmons No. OA1E REY"S/SVONISSION$
<br /> IuJI�
<br /> SUMP 0 0 ', SLOPE TANK 1" IN L H I /
<br /> SHIELD - II! DOWN TOWARDS FILL END ���""" n
<br /> TOP OF F.R.P. 0 0 Q ' V l � �®
<br /> r,
<br /> CONTAINMENT SUMP PIPE OR ' L- '- '
<br /> CONpNT COMPRESSION RING - "^ — '-' —' —'
<br /> SPILL CONTAINMENT BUCKET oZ r a "
<br /> (5 GALLON CAPACITY) INTERIOR or SUMP
<br /> WALL ft STEEL. PLATES LIMPER EACH OPENING0 PROJECT NAME ;I
<br /> C t. USINGCOMPRESSION RING AS A GUIDE, DRILL PIPE/CONDUIT HOLE AND BOLT y. BY TANK MANUFACTURER - Paul's Chevron Station
<br /> NOTES: - HOLEI'THROUGH- SUMP WALL PER TABLE BELOW r - 601 E Kettlemon Lane
<br /> 2 ASSEMBLE PARTS AS SHOWN ABOVE. UNIFORMLY TIGHTEN ALL BOLTS & Lodi, CA 98Z4O
<br /> r; 1. RISER PIPES MUST BE 16" O.C. TRUE dr PLUMB. STAINLESS STEEL CLAMP TO 60-IN.LBS, TORQUE.
<br /> FILL—VAPOR � p:, p 3i'-6 1 2'-D" D 7CNERi :
<br /> BRACKET #1600. FLEXIBLE PIPE/CONDUIT HOLE SAW BOLT HOLE MjN. VERIFY W/ TANK' MFG. MIN. Tel 510.428.1758 ' )
<br /> "
<br /> 2. ALL OVER ILLAPS AND DIMENSIONS SHALL: BE HELD TRUE ENTRY,8007 NORMAL SIZE SIZE SIZE • Fax 510.420.5898 '
<br /> e TO INSURE WATER TIGHT SEALS. FEB3075 3/4"F1 CONDUIT-0 CONDUIT 3R `- 5/16"0 " �; OCIEMAIL®AOL.com
<br /> FE03100 1"0 CONDUIT 3 -6/16"0 1201 Park Ave., Ste. 204
<br /> a " FEB620p - 2'0 FRF PIPE 4 1/2' .5/16"0 3 - - Emeryville, California 94608
<br /> SPL
<br /> BUCKET,
<br /> " ®��j'��� ` FE66309 300 FRP PIPE 4 1/2" 5/18,0 "c GENERAL NOTES: A + i
<br /> l3 � �� �1 L� u, u - NOTE; .$UMP AND .PENETRATIONS OF SUMP SHALL BE WATER TIGHT. •.FILL. TUBE 1. ALL 'GASOLINE TANK RISERS 0 FILL END 10 BE SCHEDULE 40 GALVANIZED PIPING. ORawno mta :n
<br /> PRODUCT TAN ( SECTION + DETAILS
<br /> r O SCALE: 1 1 2"=i'-0" .,:°: <:,_ 2. PRODUCT, VENT AND VAPOR UNE SIZE TO BE AS NOTED ON SHEET F'-1 AND PIPING PLAN. " ' ` .,.. J.:
<br /> / � SCHEDULE 40 BLACK IRON RISERS & fITTINO SHALL BE USED FOR DIESEL TANK INSTALLATIONS.. PR,
<br /> ���� ���� ' �� �6�
<br /> 3."ALL STEEL PIPE TO BE PRIMED AND WRAPPED. ALL RMC TO BE WRAPPED. ._-- --_
<br /> ` SCALE:, NONE;_ 6 45 `r, 4. SEE SITE PLAN FOR EXACT LOCATION OF PRODUCT TANKS. SEAT-- - - - SCALE _-- PROXOT No.
<br /> + MAX � •� '� 5. SEE SITE' PIAN FOR PENT PISER LOCATION, NOTED _ 9706
<br /> 6. J-BOX SHALL HAVE 2 MINIMUM. CLIEARANCE'FROM SUMP WALL. DRANK snc[r
<br /> `7: USE ALL,'RIGID, METAL CONDUIT,. EITHER'PVO COATED OR WRAPPED, IN THE TANK HOLE.
<br /> 8. CONTACT. CHEVRON-ENGINEER REGARDING 15 GALLON SPILL BUCKET REQUIREMENTS.
<br /> _ KP
<br /> Y"n
<br /> " - CHECKt9
<br /> A . .. . :
<br /> J.R. �� ,k
<br /> aAPPACAV10—
<br /> .' SCALE; •1/4 -1'-0 - '10 07 97 ,-
<br /> ,, .
<br /> "
<br /> 1 2 3 4 5 7 H 9 1' Q 11 . 92 13 14 $
<br /> ` C
<br /> n a .
<br /> a
<br /> ,
<br /> ,
<br />
|