Laserfiche WebLink
i 0 <br /> 3. Piping Leak Detection Monitorin E uipment <br /> Monitorin Method Manufacturer Model Monitorin Fre uenc <br /> ® Sump leak sensors connected to <br /> • continuous monitoring system <br /> Specify type: VEEDER-ROOT 794380-323 Continuous <br /> ❑ Discriminating <br /> ® Non-discriminatin <br /> ❑ Mechanical line leak detectors with <br /> programmed leak threshold of three <br /> gallons per hour <br /> ® Electronic line leak detectors with <br /> programmed leak threshold of: VEEDER ROOT PLLD 848480-001 Every pumping cycle <br /> ❑ 0.1 qph ❑0.2 gph 03 gph <br /> ® Line integrity testing by: <br /> ❑ Electronic line leak detector is <br /> equipped to conduct line tightness El Annually <br /> ❑ Third party testing ❑ Other: <br /> ® Not required <br /> ❑ Other(Specify): <br /> 4. Dispenser Leak Detection Monitorin E ui ment <br /> Monitorin Method Manufacturer Model Monitoring Fre uenc <br /> ❑ Mechanical float in dispenser <br /> containment Continuous <br /> ® Electronic leak sensor in dispenser <br /> containment: <br /> ❑ Discriminating VEEDER-ROOT 794380-323 Continuous <br /> ® Non-discriminatin <br /> • ❑Visual inspection ❑ Daily <br /> ❑ No under-dispenser containment <br /> ❑ Other: <br /> ❑ Other(specify): <br /> 5. Positive Shutdown Capabilities <br /> ❑ S stem does not have positive shutdown ca abilities <br /> ® Individual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> ®Automatic pump shut off will occur whenever: <br /> ® Release is sensed in turbine sump <br /> ® Release is sensed in primary piping <br /> ® Release is sensed at dispenser <br /> ® Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑ Other(specify): <br /> 6. Secondary Containment Testing <br /> ❑ Secondary containment is not tested <br /> ® In the State of California, secondary containment systems installed on or after January 1,2001, shall be tested upon installation, <br /> six months after installation, and every 36 months thereafter. Secondary containment systems installed prior to January 1, 2001, <br /> shall be tested by January 1,2003, and every 36 months thereafter. <br /> 7. Annual Equipment Certification/Testin <br /> LUAnnually <br /> • ❑Other(specify): <br /> Page 2 of 5 <br />