My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1986 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:34:40 PM
Creation date
11/5/2018 3:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1998
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSOCIATED ENVIRONMENTAL SYSTEMS, INC. <br />,.. TM 49Ft P.O. BOX 80427 <br />BAKERSFIELD, CA 93380 <br />(805) 393-2212 �+ <br />INVOICE NUMBER <br />LEAK DETECTOR TEST DATA <br />TEST LOCATION: FACILITY #: z/%3 2-- <br />ArC' 0 _s 1/9.3 Z CONTACT: A7 9 <br />IL E. I4o,d,,� PHONE #: <br />e <br />S4o c -k4 -,a A- TEST DATE: <br />NOTES: <br />TEST PROCEDURE <br />Test X61: perform for 30 seconds with nozzle in full open position <br />Test #2: perform for 30 seconds after nozzle closed for 10 seconds <br />EXAMPLE OF POSSIBLE RESULTS <br />Test #1 Test #2 Results Test #1 Test #2 Results <br />/ Gal __3 Gal Pass _3 Gal _i' Gal Fail <br />TECHNICIAN DATE-�, �' <br />DOES LEAK <br />RESULTS <br />PRODUCT <br />DET <br />EXIST <br />TEST <br />#1 <br />TEST <br />#2 <br />RESULTS <br />P/L <br />TEST <br />yes <br />�_ <br />Pass x_ <br />Pass <br />>c <br />REG <br />no <br />/, ! <br />Gal <br />S, l <br />Gal <br />Fail <br />Fail <br />yes_ <br />C� <br />Pass_ <br />Pass <br />X <br />R/UL <br />no <br />/_Q_ <br />Gal <br />2.0 <br />Gal <br />Fail <br />Fail <br />yesCom_ <br />Pass �_ <br />Pass <br />X <br />S/UL <br />no <br />Gal <br />Gal <br />Fail <br />Fail <br />yes <br />Pass <br />Pass <br />DSL <br />no <br />Gal <br />Gal <br />Fail <br />Fail <br />NOTES: <br />TEST PROCEDURE <br />Test X61: perform for 30 seconds with nozzle in full open position <br />Test #2: perform for 30 seconds after nozzle closed for 10 seconds <br />EXAMPLE OF POSSIBLE RESULTS <br />Test #1 Test #2 Results Test #1 Test #2 Results <br />/ Gal __3 Gal Pass _3 Gal _i' Gal Fail <br />TECHNICIAN DATE-�, �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.