Laserfiche WebLink
1 12 <br />N <br />z <br />El <br />2 <br />E-4 <br />L-1 High .I., table 1n lank excavation <br />CD F7 <br />:2!! <br />LU LULU <br />1 --LU <br />6 <br />CD <br />Cn <br />(D W <br />< <br />LL <br />ill <br />---7 <br />< <br />CD <br />#U-1 <br />z <br />cc <br />C) <br />< <br />CD <br />LU <br />10C <br />cr <br />f-- <br />76 <br />6 <br />CD LIJ '76 <br />cl: W <br />CD C'I: CL <br />W <br />F— <br />W <br />;e_' <br />z <br />c <br />-iii< <br />CD <br />a: <br />z <br />as <br />< <br />LU <br />W 1--< <br />CD CC <br />Uj <br />J) <br />C) <br />Cl- <br />Ct <br />L' LU <br />cc I- <br />LU <br />i-•-:< <br />(J') _< <br />:;rf < <br />I U_ < <br />W <br />Natat tabic to lank bottom <br />in, <br />digits <br />NOTES: <br />C6 <br />Ao <br />IZ, <br />Name of Supplier. O.—r or Deal., Address 1414., and Sh..jul) <br />15. TANK To T EST <br />ba. BRIEF DIAGRAM OF TANK FIELD <br />Identify by position <br />Brand and Grade <br />17, FILL -UP FOR. TEST <br />Slick Water Bottom <br />before Fill -up in, <br />to 'A' <br />Gotten& Tank Diameter <br />City <br />I <br />z <br />CD <br />lAJ <br />tJ <br />CD 2 <br />< <br />Sr <br />CD <br />C-) <br />—a <br />E-il <br />01 0,1 <br />01 01 <br />M r__A <br />!;late <br />Dal. .1 Test <br />16. CAPACITY Fro., <br />0 Station Char% <br />Nominal Capacity Tank Manufacturer*s Chart <br />Gallons <br />Company Engineering Dole <br />Ely M031 accurate tEl Ch -13 supplied with Tank Tesler <br />capacity chart si,isdI able 0. Other <br />Gallons <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 1:1 Water In lank 0 Lme(a) being tested with LVLLT <br />Sea Manuel 30cliOns applicable. Check below and record procedure in full (27). <br />L-1 High .I., table 1n lank excavation <br />CD F7 <br />19. TANK MEASUREMENTS FOR <br />TSTT ASSEMBLY <br />6 <br />CD <br />bollorn of lank jo grade, ....... <br />(D W <br />< <br />Lu <br />< <br />2- 14.01911110 12'mask fro., grade <br />< <br />20. EXT ENSIGN HOSE SE I—TING <br />ccU <br />cc — <br />C <br />7�)t- <br />CC < <br />LIj a_- W <br />CD M <br />Go <br />U) <br />cr <br />f-- <br />76 <br />6 <br />CD LIJ '76 <br />4. P, esa­ aI lop 01 lank <br />W <br />F— <br />M <br />LU <br />z <br />C.) <br />In. <br />USE WITH THERMAL SENSOR <br />PN5039 (Blue Box', <br />1 <br />2Z Tho—ol-Sensor reading after circulation <br />cri C3 <br />gi <br />digits <br />C'j <br />ir, <br />23- Sighs per 'F in IA090 of 8.paclod change <br />gF <br />Natat tabic to lank bottom <br />in, <br />digits <br />NOTES: <br />!;late <br />Dal. .1 Test <br />16. CAPACITY Fro., <br />0 Station Char% <br />Nominal Capacity Tank Manufacturer*s Chart <br />Gallons <br />Company Engineering Dole <br />Ely M031 accurate tEl Ch -13 supplied with Tank Tesler <br />capacity chart si,isdI able 0. Other <br />Gallons <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 1:1 Water In lank 0 Lme(a) being tested with LVLLT <br />Sea Manuel 30cliOns applicable. Check below and record procedure in full (27). <br />L-1 High .I., table 1n lank excavation <br />Use ma xI­m allowable lost p,93ac,s I., oil jells. <br />Four pound -1. does not apply to doubl—lied lank$, <br />cooml.l. S.cilori below: <br />19. TANK MEASUREMENTS FOR <br />TSTT ASSEMBLY <br />bollorn of lank jo grade, ....... <br />I. Is [our Pound rule requ4ed7 <br />Yoe No <br />Add 30' for -r' probe astry, . ......... ­...... <br />Tula! Tubing to assemble — approximaio.. <br />30 in. <br />lm <br />2- 14.01911110 12'mask fro., grade <br />20. EXT ENSIGN HOSE SE I—TING <br />3. Pressure of bottom of lank <br />C <br />7�)t- <br />Tank lop to ijf.da' ...... ...... <br />E.I.nd hose on auction tube 6, or more <br />In. <br />below lank lop ................. <br />4. P, esa­ aI lop 01 lank <br />T Fill pipe extends above Inert., use lop of 1111. <br />r Itoplin of bud.; <br />In. <br />USE WITH THERMAL SENSOR <br />PN5039 (Blue Box', <br />1 <br />2Z Tho—ol-Sensor reading after circulation <br />digits <br />Tank dia. <br />ir, <br />23- Sighs per 'F in IA090 of 8.paclod change <br />gF <br />Natat tabic to lank bottom <br />in, <br />digits <br />NOTES: <br />The above calculations are to be used for dry soil conditions to <br />establish a positive pressure advantage, orwhon using She four pound <br />rule to compensate lot Ilia presence of subsurface water In the lank <br />area, <br />Rotor to N.F.P.A. 30. Sections 2-3.2.4 and 2-7.2 and the tank <br />manufacturer regarding allowable system lost pressures, <br />24a, If: USING THERMAL SENSOR DTS-2000 <br />OR QC -2000 WHICH READ 1000 DIGITS <br />PER *F TRANSFER 1000 TO LINE 26, <br />DIGITS PER 'F IN TEST RANGE, <br />25, ( - <br />Total quantity In 130.1ficiani OT gap—sicr, for <br />lull lank (17) lri,ol,ad pmduc <br />Total Gallons <br />go. Reading <br />inventory In Tank <br />Vithor Bottom <br />Top off equipment <br />Total Quardfly <br />21, VAPOR RECOVERY SYSTEM Stalls I t�%slaga It <br />94b, COEFFICIENT OF EXPANSION <br />RECIPROCAL METHOD <br />Type of Product ...... <br />Hydi orrielar Employed H <br />Truniptnalura in Tank <br />After Circulation <br />Temperature of Sample .............................®..11:i i <br />Difference (./-) ......... ...... ........... <br />Observed A.P.I. Gravity <br />Flocip,ocal Page N <br />LE) <br />Total quantity In Reciprocal Volume change In <br />lull lank (17) this lank par *F <br />T,snsfo, to Line 26s. <br />24c, FORTESTINI-g WITH WATER ase Tables � <br />Water Temperature after C;u;,uu!im <br />,able C from Thermal Sensor....,,.,,. _.F <br />Coefficient 01 Wolof` <br />T.b;e D <br />- --------- <br />Added S.,fachimm? Yes ONO Transfer CO3-I1Lina 25b. <br />gallons <br />Volume champs in this lank <br />Per <br />